Description
AMENDMENT 04 (2026 Jun 25) -- the following changes and updates have been made: 1. Q and A (2026 Jun 22) is attached. 2. Combined Synopsis/Solicitation (CSS; the main solicitation document) has been updated -- a. There are two evaluation factors: Technical Acceptability [pass/fail] and lowest total price. b. Offer Due Date is Thursday, July 23rd, 2026 (Noon CDT) . c. RFO reference links are updated. d. Technical Approach documentation is limited to 100 pages (Word, Excel, and PDF only). e. Late quotes will NOT be accepted. f. Contractor Responsibility has been spelled out. g. Technical Acceptability information provided. h. All references to RFO FAR have been updated to RFO. i. Misc. para. numbering and PZIMC's location has been updated. 3. Quote Sheet (2026 Jun 25) - a storage CLIN has been added. REMINDERS: This is an All-Or-Nothing Requirement – You're not just supplying us with the Impact Innovation EcoCSII Cold Spray Machine: you're supplying us with EVERYTHING, such as -- Impact Innovation EvoCSII Cold Spray Machine – [BRAND NAME] configured for Helium & Nitrogen Carrier Gas and Multi-Gas Sprays; equipped with nozzle cooling, powder feeder station configured for 2 powder feeders, and 2 powder feeders; EvoCSII 6/11 AH Cold Spray Gun; includes all additional tools listed in Appendix A of the Statement of Work (SOW). See SOW for machine details. Fanuc M-710iC/50 Industrial Robot – [BRAND NAME] delivered with all options listed in the SOW. Nitrogen Supply System – capacity sufficient to meet gas consumption on 4-6 week refill schedule; compressor sized to produce 3600psig; gas provided at 99.999% purity; configured for outdoor service; configured with capacity telemetry to schedule delivery; foundation assessment (new foundation, if required); see SOW for details. Argon Fire Suppression System – meets requirements set in NFPA 484 and NFPA 2001. See SOW for details. HiWatch HR2 Particle Measurement System – [BRAND NAME] with sensor. See SOW for details. ReliaCoat In-Situ Coating Property (ICP-8) Sensor – [BRAND NAME] see SOW for details. Dust Handler/Collector – with spark arrester and blast venting. See SOW for details. High-Pressure Gas Plumbing – see SOW for details. Ancillary Equipment – all additional items and components included as listed in SOW System Integration – as outlined in SOW. Installation – see SOW for details. Training – see SOW for details. The successful offeror will be responsible for EVERYTHING spelled out in the SOW. The successful offeror will be the supplier, installer, integrator, and trainer for this requirement. Failure to quote on just one item we need will render you ineligible for award. Use of Simplified Procedures – We're using RFO 12 procedures, which gives us great flexibility and in evaluations and issuing awards. RFO 15 does not apply. Small Business Set-Aside : This acquisition is a 100% Small Business Set-Aside. The NAICS Code is 334519 (size standard: <600 emplo…
Classification
Place of Performance
Contracting Office
Contacts