AI Summary
Description
Sources Sought Title: USCGC PATOKA (WLR-75408) FY27 DD Repairs The U.S. Coast Guard is looking for sources which would be interested in performing Drydock repairs for Coast Guard Cutter USCGC PATOKA (WLR-75408) USCGC PATOKA ( WLR-75408 ) is a 75 ft. river buoy tender USCGC PATOKA HOMEPORT ADDRESS: 1797 HARBOR FRONT ROAD, GREENVILLE, MS 38701 ANTICIPATED PERIOD OF PERFORMANCE IS 04/13/2027 to 06/22/2027. (Subject to change) (Subject to Availability of Funds) PLACE OF PERFORMANCE: Contractors Facility The scope of this acquisition is for the drydock repairs of various work items for USCGC PATOKA work will include, but is not limited to: WORK ITEM 1: Fire Prevention Requirements DRYDOCK WORK ITEM 2: Hull Plating, U/W Body, Inspect - Tender WORK ITEM 3: Hull Plating, U/W Body, Ultrasonic Testing - Tender WORK ITEM 4: Hull Plating, Freeboard, Ultrasonic Testing - Tender WORK ITEM 5: U/W Body, Preserve, 100 percent - Tender WORK ITEM 6: Hull Plating Freeboard, Preserve, 100 Percent- Tender WORK ITEM 7: Appendages, U/W, Leak Test – Tender WORK ITEM 8: Propulsion Shaft Rope Guards, Inspect WORK ITEM 9: Appendages, U/W, Internal, Preserve - Tender WORK ITEM 10: Voids, Non-Accessible, Leak Test - Tender WORK ITEM 11: Voids, Non-Accessible, Internal Surfaces, Preserve WORK ITEM 12: Tanks, MP Fuel Service, Clean and Inspect - Tender WORK ITEM 13: Tanks, Potable Water, Clean and Inspect - Tender WORK ITEM 14: Tanks, Ballast, Clean and Inspect - Tender WORK ITEM 15: Voids, Accessible, Clean and Inspect WORK ITEM 16: Propulsion Shafting, Straighten WORK ITEM 17: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew WORK ITEM 18: Propulsion Shafting, Remove, Inspect, and Reinstall WORK ITEM 19: Propulsion Shaft Bearings (External), Renew WORK ITEM 20: Stern Tube Interior Surfaces, Preserve, 100 Percent WORK ITEM 21: Propeller, Perform Minor Repairs and Reconditioning WORK ITEM 22: Propellers, Remove, Inspect, and Reinstall WORK ITEM 23: Keel Coolers, Clean, Inspect and Hydro WORK ITEM 24: Fathometer Transducer, General Maintenance WORK ITEM25: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM26: Sea Strainers, Duplex, All Sizes, Overhaul WORK ITEM 27: Rudder Assembly, Remove, Inspect And Reinstall WORK ITEM 28: Rudders, Preserve, 100 Percent WORK ITEM 29: Rudder Stock Housing, Lower, Renew WORK ITEM 30: Rudder Stock Housing, Upper, Renew WORK ITEM 31: Rudder Stock, Rebuild WORK ITEM 32: Spuds, Overhaul – Tender WORK ITEM 33: Spud Wells, Preserve - Tender WORK ITEM 34: Spud Wells, Inspect - Tender WORK ITEM 35: Sewage Holding Tanks, Clean and Inspect - Tender WORK ITEM 36: Tanks (Sewage Holding), Preserve, 100 percent - Tender WORK ITEM 37: Accessible Voids, Preserve, 100 Percent - Tender WORK ITEM 38: Tanks, Ballast, Preserve, 100 Percent – Tender WORK ITEM 39: Tanks, Fuel, Preserve, 100 Percent - Tender WORK ITEM 40: Tanks, Potable Water Preserve, 100 Percent - Tender WORK ITEM 41: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System-T…
Classification
Contracting Office
Contacts