AI Summary
Description
The purpose of this amendment is to attach the graphics requirements and provide additional specifications for the trailer height, UPS system, EIA equipment rack, roof-mounted antennas, and exterior monitor. Procurement: 42 ft. Mobile Command Center (MCC) TrailerSCOPE:The contractor shall design, manufacture, and deliver one (1) custom-built, heavy-duty Mobile Command Center (MCC) trailer. The MCC will serve as a multi-agency incident command post for FES, Police, Guards, and Garrison Command Staff during large-scale emergencies.PLATFORM AND EXTERIOR SPECIFICATIONS:Dimensions: Minimum 42 ft. Length x 8 ft. Width (nominal).Hitch Type: Heavy-duty 5th-Wheel Kingpin (or Gooseneck) configuration, matched to a GVWR appropriate for the fully loaded trailer.Slide-Outs: Minimum of two (2) flat-floor slide-outs to maximize interior operational space.Leveling System: Heavy-duty automatic hydraulic leveling system (minimum 4-point).Awning: One (1) heavy-duty motorized awning on the curbside, positioned to cover the exterior monitor, with an automatic wind-retraction sensor.Graphics: Full custom exterior vinyl wrap with Department of War / Garrison FES branding and reflective striping (graphics package to be approved by the Government post-award).Lighting:Minimum of two (2) high-lumen LED scene lights per side (8 total).Full emergency warning light package (Red/Blue LEDs) conforming to emergency vehicle standards.POWER AND CLIMATE CONTROL:Generator: Minimum 20kW Onan (or equivalent) commercial-grade diesel generator with remote interior start and custom fabricated fuel cell.Climate Control: Three (3) 15,000 BTU roof-mounted HVAC units with heat pumps/strips, ducted for even air distribution, capable of maintaining 70�F interior temperature in extreme high-heat environments (110�F+ ambient).Shore Power: Heavy-duty shore power connection (e.g., 50A or 100A as appropriate for load) with a minimum 50-foot heavy-duty male-end umbilical cord.Power Protection: Rack-mounted Uninterruptible Power Supply (UPS) sized to support the communications and server rack to prevent drop-outs during power transition.INTERIOR LAYOUT AND FINISHES:Zones: Trailer must be divided into a Main Operations Area and a secure Conference Area, separated by a sound-deadening door. No lavatory or kitchenette to be included.Workstations: Six (6) total dedicated workstations. One (1) workstation must be customized specifically for a Dispatch Console.Desks/Cabinetry: Heavy-duty, commercial-grade desks and overhead/under-desk aluminum or high-pressure laminate storage cabinetry for each workstation.Whiteboards: Two (2) large magnetic dry-erase whiteboards (one in the main area, one in the conference area).COMMUNICATIONS AND TECHNOLOGY:Server Rack: Minimum one (1) full-height or half-height 19 inch EIA equipment rack structurally mounted and cooled.Radio Prep: Pre-wired for Government Furnished Equipment (GFE) Motorola and Harris radios. Must include roof-mounted antenna bases and coaxial cable run…
Classification
Place of Performance
Contracting Office
Contacts