• The Federal Acquisition Regulation (FAR) requires clear date and time for proposal receipt, not just a textual change.
• Dredging services at McAlpine Locks and Dam on the Ohio River near Louisville are required under an unrestricted competition with NAICS 237990 (Other Heavy and Civil Engineering Construction).
• Maintaining a navigable 9-foot channel depth on the Ohio River is a key technical requirement.
Description
Revised the due date for receipt of proposals. The new due date and time is December 8, 2025 at 2025 at 1200 noon local time. All other terms and conditions of the solicitation remains unchanged. 2. 19CY6026Q0004 Q&A 1 3. 19CY6026Q0004 Minutes of the Meeting