Description
Five-Year Obstruction Inspection of Sprinkler System Coatesville VA Medical Center 1. Scope The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility's sprinkler systems in accordance with NFPA (National Fire Protection Association's) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges. 2. Applicable Standards All work shall comply with NFPA 25 (current edition) and VA policies and directives. 3. Requirements The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee's name. 3.1. Building 1 Annual Inspection The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer's pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC. 3.2. Sprinkler System Maintenance & Internal Inspection A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139. Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed: Base Year - Services for Buildings 1, 2, 3 Option Year 1 - Services for Buildings 4, 6, 7 Option Year 2 - Services for Buildings 8, 9, 38 Option Year 3 - Services for Buildings 39, 57, 59 Option Year 4 - Services for Buildings 69, 138, 139 Building maintenance will be grouped together with …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)