AI Summary
Description
USACE Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: a) Hazardous material / debris abatement and removal mostly within the crawl space b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc. c) Removal at ~ 90% removal of building mechanical – electrical systems d) Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: e) New exterior envelope f) New building mechanical – electrical systems g) New Thermoplastic Polyolefin (TPO) Roof system h) Painting of exteriors Other considerations for site work coordination: i) New utility connections (mostly by other entities) j) Shared construction boundaries with adjacent current and future projects
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)