AI Summary
Description
This is a combined synopsis/solicitation for a construction requirement prepared in accordance with the Federal Acquisition Regulation (FAR), including FAR Part 13, Simplified Acquisition Procedures, and FAR Part 36, Construction and Architect-Engineer Contracts, as applicable. This announcement constitutes a solicitation; offers are being requested in accordance with the terms, conditions, specifications, and attachments included in this notice. A separate written solicitation will not be issued. U.S. Fish and Wildlife Service, Modoc National Wildlife Refuge ¿ Alturas, California design and construct requirement for a durable, safe, and structurally sound in-canal concrete water control structure that meets all regulatory standards. The structural integrity and safety shall ensure the in-canal structure is built to support the expected load capacities, tractor trailer and pedestrian traffic. The in-canal shall adhere to applicable safety standards and codes to mitigate risks during construction and throughout the operational life of the structure. The functionality and accessibility must provide a seamless connection between the specified locations to enhance efficiency and administrative access. Sustainability and environmental considerations should minimize environmental impact through the uses of sustainable materials and construction practices. Implement measures to protect nearby ecosystems and waterways during construction and operation. The compliance and quality assurance shall follow all local, state, and federal regulations governing construction activities. The construction magnitude is estimated to be between $50,000.00 to $60,000.00. 100% performance bonds and payment bonds will be required The office is located: USFWS - Modoc National Wildlife Refuge (MNWR) 5364 County Road 115 Alturas, California 96101 Performance Period and Completion: The Period of Performance shall be 62 calendar days and will commence upon issuance of the Notice to Proceed (NTP). The Contractor shall receive the NTP within 10 calendar days after contract award. The anticipated Period of Performance is August 31, 2026 - October 30, 2026. Wage Rates: General Wage Rate Decision Number: CA20260007 Construction Type: Building, Heavy and Highway Date: (05/18/2026) State: California County: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sirerra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba This acquisition is subject to the Davis-Bacon Act. Applicable wage determination(s). Contractors must comply with minimum wage and labor standards set forth therein. This Request for Proposal (RFP) is a TOTAL SMALL BUSINESS SET ASIDE and is conducted under the procedures of FAR Parts 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition Circular 2025-06. The NAICS code is 237310 and the small business size standard is $45.0m. Instructions to offeror: All re…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)