AI Summary
Description
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 66017 Repair Restrooms. Demolition Contractor must remove and dispose of existing ceiling grid, ceiling tiles, gyp ceilings, light fixtures, and mechanical diffusers and grills within scope of work boundary. (Approx. 150 Sq. Ft.) Contractor must remove and dispose of existing restroom plumbing fixtures within SOW boundary. Contractor must remove and dispose of existing restroom walls within SOW boundary. Contractor must remove and dispose of existing exterior door and frame. Prep opening for wall infill. Contractor must remove and dispose of existing exterior metal steps. Contractor must remove and dispose of existing interior vestibule door and frame. Contractor must remove and dispose of existing flooring and resilient wall base in existing restrooms and vestibule. All receptacles located within demolished walls must be removed and conduit and wiring must be removed back to nearest J-box. Contractor must remove and set aside existing drinking fountain for reuse in new work. All utility lines not reutilized in new work must be capped under floor or in nearest wall not being removed. Contractor must remove and dispose of existing fire alarm pull station – wiring back to nearest J-box. Contractor must remove existing fire extinguisher and bracket and set aside for reuse in new work. Construction Contractor must construct new ceiling with metal studs and moisture resistant gypsum wall board in each restroom. Ceiling to be taped, textured, and painted (P-1). Contractor must provide and install new exhaust fan (EF-1) in each restroom as indicated on drawings. Contractor must configure existing exhaust system to new fan locations. Exhaust fans must be connected to restroom light switch. Contractor must provide and install new LED light fixtures (LF-1) utilizing existing circuitry. Contractor must provide and install light switches with stainless steel cover plates for each restroom. Contractor must provide and install mechanical diffusers as indicated on plans, connect back to existing HVAC system. Contractor must provide and construct new restroom partition walls as indicated on plans – wall construction to be moisture resistant gypsum wall board on metal studs. Studs to be metal 3-5/8” or 6” if required to facilitate plumbing. Contractor must tape, texture, and paint walls (P-2). Contractor must provide and install Fiberglass Reinforced Paneling wall covering up to 60” AFF around interior of restroom walls. Contractor must provide and install new water closets (WC-1, WC-2) in each restroom, each water closet must be tied into existing utilities (supply water, sanitary drain) as required for proper functioning. Contractor must provide and wall mounted lavatories (LV-1) and faucet (FC-1) in each restroom, ea…
Award Details
Classification
Place of Performance
Contracting Office
Contacts