AI Summary
Description
**W912EE** Amendment One - The purpose of this amendment is to update the Scope of Work details and change the set aside type to unrestricted. The request for quotes date is changed to November 6, 2026, at 3PM Central Time. Please see updated Scope of Work and Amendment. Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation This is a solicitation for commercial items prepared in accordance with the format in RFO Part 12, as supplemented with additional information included in this notice. Solicitation Number W912EE27QA002 is being issued as a request for quote (RFQ) with the intent to issue one Firm-Fixed Price Contract. This solicitation is being issued under 100% small business set aside. The NAICS code for this procurement is 332311, Prefabricated Metal Building and Component Manufacturing, with a size standard of 750 employees. This procurement is being conducted in accordance with regulations at RFO Part 12 - Acquisition of Commercial Products and Commercial Services. The U.S. Army Corps of Engineers, Arkabutla lake Project, has a requirement to procure one metal building to cover and protect the new well. Arkabutla Lake Project has previously had a new well installed and now requires the old well to be abandoned and the surrounding small 30 x 50 building to be rehabbed to continue to protect the new well. The USACE personnel will perform prep work prior to deliver and install by removing the old building where replacement pre-fabricated building will be delivered and installed. Please see below for details. General Specification: Abandon old well Install new plumbing includes valves to meet AWWA C-509 specs, flange fitting to meet AWWA specs, watts 2” pressure reducer, 2” flange master meter, Stenner model 45MHP10 chemical pump, 3 phase air compressor, accessories and fittings to connect and create a working system Purchase, deliver, & install one (1) 30'x50' pre-fabricated metal Red Iron open span building with 12' tall eaves, 26-gauge roof & walls, one (1) roll up door, one (1) 3'x7' walk through door, insulation, and gutters. Building will include engineer's stamped drawings for the building and a set of anchor bolt plans. Sand blast and paint tank with one (1) coat Tnemec-Zinc 3-5ml inside and out. Second coat inside Tnemec series 21 6-9ml. Third coat inside Tnemec series 216-9ml. Second coat outside L140 epoxy 6-9ml. Third coat outside 1094 urethane 5-7ml. Install new electrical including 200-amp enclosed circuit breaker outside (2020 NEC requirement), 200-amp main breaker panel inside, pump control panel with motor starter to control well, disconnect at well, six (6) 8” long LED strip lights, two (2) 55 watt outside lights with photocell, ten (10) 120V outlets including an outside GFCI, 3 phase circuit for air compressor, and reconnect existing pressure controls on tank The contractor shall provide all supervision, labor, tools, equipment, and tools necessary for purchase and installation no later than 120 …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (4)