AI Summary
Description
This is a pre-solicitation notice for an upcoming requirement by Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) and Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka (FLCY) for Ship Repair services. The Government intends to issue a solicitation for a Firm-Fixed-Price (FFP) contract for the repair and continuous maintenance of United States Navy (USN) Surface Ship USS MUSTIN (DDG-89). The anticipated scope of work includes, but not limited to the following work items known as Task Group Instructions (TGI): TGI DESCRIPTION 38CK212304 CLEAN ASSESS INSPT RPR PRESERVE POTABLE WATER TANK 4-150-2W 38CK212305 CLEAN ASSESS INSPT RPR PRESERVE POTABLE WATER TANK 4-150-2W 38CK212306 CLEAN ASSESS INSPT RPR PRESERVE POTABLE WATER TANK 4-150-2W 38CK212307 CLEAN ASSESS INSPT RPR PRESERVE POTABLE WATER TANK 4-150-2W 38CK212308 CLEAN ASSESS INSPT RPR PRESERVE FOR WST DR TK 5-292-2-W 38CK212309 CLEAN ASSESS INSPT RPR PRESERVE PLMB WASTE DRAIN TANK 1 38CK212310 CLEAN ASSESS INSPT RPR PRESERVE PLMB WASTE DRAIN TANK 2 38CK212311 CLEAN ASSESS RPR PRESERVE VOID (0 1/2-MM-0-V) 38CK212312 CLEAN ASSESS RPR PRESERVE VOID (01-115-2-V) 38CK212313 CLEAN ASSESS RPR PRESERVE VOID (2-220-5-V) 38CK212314 CLEAN ASSESS RPR PRESERVE COFFERDAM (5-254-4-V) 38CK212315 CLEAN ASSESS INSPT RPR PRESERVE SEWAGE COLLECTION TANK 1 38CK212315T SEWAGE SYS (T & OP) - KTR 38CK212316 CLEAN ASSESS INSPT RPR PRESERVE SEWAGE COLLECTION TANK 2 38CK212316T SEWAGE SYS (T & OP) - KTR 38CK212325 CLEAN AND ASSESS COFFERDAM (5-204-1-V) 38CK212326 CLEAN AND ASSESS VOID (5-34-0-V) 38CK212327 CLEAN AND ASSESS VOID (6-31-0-V) 38CK212328 CLEAN AND ASSESS VOID (3-78-0-V) 38CK212351 OPEN AND CLEAN WST WATER DR TK (5-212-2-W) 38CK213601 REPLACE NONSKID SYSTEM ON FORECASTLE 38CK225101 INSPT RPR PRESERVE IN ENG RM 1 GTM AND SSGTG INTAKE D/S 38CK225102 INSP RPR PSV IN ENG RM 2 GTM & SSGTG 2 & 3 INTAKE DIRTY SIDE 38CK225103 INSPECT AND PRESERVE AFT LOUVER 38CK225104 INSP RPR PSV 1A GTM, 1B GTM AND NO. 1 SSGTG EXHAUST DUCT EDCTOR 38CK225105 INSPT RPR PSV NO. 3 SSGTG EXHAUST DUCT EDUCTOR 38CK225106 INSP RPR PSV 2A GTM 2B GTM AND NO. 2 SSGTG EXHAUST DUCT EDUCTOR 38CK225107 INSPECT AND PRESERVE FWD LOUVER 38CK225901 INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE 38CK225902 INSPT RPR PRESERVE AFT UPTAKE SPACE 38CK247101 ACCOMPLISH PRESSURIZED WAVEGUIDE & TRANSM LINE DRY AIR LAY-UP 38CK247101T AIR SYSTEM, DRY (T & OP) - KTR 38CK258803 REPLACE AIRCRAFT SECURING FITTING ON FLIGHT DECK 38CK258803T A/C SECURING FITTING (LOAD TEST) - KTR 38CK259301 CHEMICAL CLEAN VCHT PIPING SYSTEM THROUGHOUT THE SHIP 38CK259301T SEWAGE SYS (T & OP), CHEM FLUSH - KTR 38CK263401 ACOMP ASE RPR PSV OF RAST TROUGH & REPLT FLDK & HGR DK NONSKID 38CK263401T01 POTABLE WATER SYS (T & OP) - KTR 38CK263401T02 RAST SYSTEM TRACK (LOAD TES…
Classification
Place of Performance
Contracting Office
Contacts