Description
Pre-solicitation Notice For 15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK This is a PRE-SOLICITATION NOTICE for the construction of a 15kV Switchgear & Station Service Replacement at Lake Tenkiller, in Oklahoma. TH IS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to perform the 15kV Switchgear & Station Service Replacement at Lake Tenkiller, Oklahoma. The proposed design-bid-build project will be procured as a Small Business Set-Aside, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted. Project Description: The work includes Replace the three existing 15kV switchgear lineups for the generator breakers and station service transformer feeder breakers. Removal of existing 500 kVA, 13.8 kV/480V station service transformer Removal of existing 15 kV switchgear and breakers located beneath control room Removal of 480V station service switchgear in control room Removal of the existing 15kV cables to the switchyard Removal of existing potheads for the 15kV cable transition to switchyard bus Removal of the existing asbestos cable trays containing 15kV cables in cable tunnel Installation of new 15kV cables to the switchyard Installation of new potheads for the 15kV cable transition to switchyard bus Installation of new cable trays containing the new 15kV cables in cable tunnel Installation of front accessible double-ended 480V switchgear beneath control room with feeder circuit breakers Installation of 15kV switchgear with new vacuum circuit breakers and redundant 500 kVA 13.8kV/480V, high-resistance grounded wye station service transformers Reconfiguration of project diesel generator to wye-grounded with high-resistance grounding resistor. New control and annunciation wiring for new 480V and 15kV switchgear where existing cables are not reused. Modifications to protective relay settings and new protection relays for the new station service feeders. Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arc flash mitigation switches. Replacement and relocation of existing Lighting Transformer The estimated magnitude of construction for this project is between $5,000,000 and $10,000,000. The North American Industrial Classification System (NAICS) Code for this procurement is 238210, Electrical Contractors and Other Wiring Installation Contractors, which has a small business size standard of $19M. The Product Service Code is: Y1NZ (Construction of Other Utilities) Estimated duration of construction of this project is 900 calendar days. Anticipated solicitation …
Classification
Place of Performance
Contracting Office
Contacts