- • Design and construct five potable groundwater production wells with telemetry and pumps at Fort Drum, NY.
- • Construct HDPE DIPS water main pipes and overhead electric three-phase power distribution to the well sites.
- • Implement Low Impact Development stormwater management strategies and provide variable frequency drives for each well.
- • Construct access roads, fencing, and gates for each well house, with fire department connections and signage.
AI summary · generated 11/25/2026 · verify on SAM.gov