AI Summary
Description
*see attachments Statement of Work (SOW) 2026 Chevrolet 3500 HD (Single Rear Wheel) OEM Bed Removal and Installation of CM Truck Bed – Model 8'6/84/54/42 1. Vehicle Information • Make/Model: 2026 Chevrolet 3500 HD • Configuration: Single Rear Wheel • Current Condition: Equipped with factory‑installed OEM pickup bed and back up camera on factory installed bed • VIN: 1GC4KSEY1TF291258 2. Contractor Responsibilities The contractor shall perform the following: A. Removal of Factory Bed • Safely disconnect all electrical, back up camera, sensors, fuel filler, and auxiliary connections tied to the OEM pickup bed. • Remove factory bed without damage to the truck frame, chassis wiring, or components. • Inspect and clean mounting points on the frame after bed removal. B. Preparation for Upfit • Verify chassis measurements and mounting compatibility for CM model 8'6/84/54/42. • Ensure all wiring harnesses, lighting connectors, and fuel filler components are positioned for proper integration with the new bed. • Provide any necessary mounting hardware if not included by the manufacturer. C. Installation of CM Truck Bed (Model 8'6/84/54/42) • Properly mount and secure the CM bed to manufacturer specifications and torque requirements. • Align and install fuel filler neck, rear lighting, license plate lighting, and reverse sensors (if applicable). • Connect and test all electrical systems including brake lights, turn signals, reverse lights, and marker lights. • Ensure the bed sits level, securely fastened, and free of vibration or interference with vehicle components. D. Quality Check and Testing • Perform full inspection confirming structural security, proper alignment, and correct electrical function. • Test vehicle lighting and safety systems to ensure compliance with DOT requirements. • Verify proper clearance between bed, tires, frame, and suspension components. 3. Deliverables • Completed removal of OEM bed • Fully installed CM Truck Bed (Model 8'6/84/54/42) • Documentation of all work performed 4 . Schedule • Work to begin on: 8/1/26 • Estimated completion: 8-12 weeks 5. Acceptance Criteria The installation will be considered complete when: • CM bed is mounted to manufacturer specifications • All electrical and safety systems function correctly • No fault codes or warning indicators are present • Vehicle passes final inspection by the government/agency representative 6. Additional Requirements • Contractor must follow all safety protocols and industry standards. • Any changes, unexpected issues, or additional parts required must be approved before proceeding.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)