AI Summary
Description
********************************AMENDMENT 0001************************************* Amendment 0001 to SIR 6973GH-26-R-00199 is issued to re-open the SIR, extend the close date of the SIR, answer un-posted questions from industry that were received within the allowed question and answer SIR period, update the Schedule B. SEE BELOW: FIRST: SIR is re-opened SECOND: SIR close date is changed from 08/26/2026 to 11/23/2026 THIRD: Please see SIR Questions and Answers (attached). Whether you previously provided a proposal or have not provided a proposal to this point, anyone is eliglble to provide a proposal before the new SIR close date. If you have previously provided a proposal to SIR 6973GH-26-R-00199, the contracting officer will be reach out with instructions. FOURTH: Clause AC1604 CONTRACT PERIOD is updated to make the new period of performance (POP) as follows: The effective period of this contract is 1 year from 01/19/2027, plus four, 1-year options if exercised. FIFTH: Schedule B dated 07/08/2026 is removed and replace by Schedule B Rev. 1 dated 11/06/2026. The Schedule B is updated to correct description of the Bell 412 Maintenance Initial Training. The POP is also updated to reflect the new POP. SIXTH: M.8 Evaluation Criteria Factor 5 is removed and replaced with the following language: FACTOR 4: THE OFFEROR MUST PROVIDE THE QUALIFICATION STATEMENTS AND RESUMES OF THE INSTRUCTORS IN ACCORDANCE WITH THE PWS & THE SOLICITATION. CRITERIA: Persons utilized as instructors must provide evidence of professional technician's experience as outlined in Section G.5 of the PWS. a. A professional Maintenance Technician with five (5) years of industry experience. b. Minimum of three (3) years of experience with each aircraft being proposed under Section A; AND c. Minimum of three (3) years of instructor experience ACCEPTABLE: The Standard is met when the offeror meets provides qualification statements and resumes of the instructors to meet the requirements of section G.5 of the PWS and solicitation requirements. SEVENTH: Clause AC0250 was included in error and has been removed. EIGHTH: All other terms and conditions remain unchanged. ****************************************************************************** The Federal Aviation Administration (FAA), Mike Monroney Aeronautical Center (MMAC), Oklahoma City, Oklahoma, has a requirement for Helicopter Field Maintenance Training IAW Air Transport Association (ATA) 104 Specifications for Federal Aviation Administration (FAA) Airworthiness (Maintenance/Avionics) Inspectors on the following helicopters: Bell 206B Field Maintenance Training, Bell 429 Field Maintenance Training, Bell 407 Field Maintenance Training and Bell 412 Maintenance Initial Training. It is the intent of the Government to award multiple contract(s) using an Indefinite Delivery/Requirements type Contract priced by CLIN with student qualifier for a one (1) year base period and four (4) option years, if exercised. The Government intends to awa…
Classification
Contracting Office
Contacts
Attachments (5)