• The Navy seeks vendors to design, manufacture, and construct 11 Child Development Centers using industrialized construction methods.
• The project involves constructing approximately 324,919square feet at various locations, meeting DoD Unified Facility Criteria and Whole Building Design Guide standards.
• Vendors must utilize CDC IC design standards and Modular Open Systems Approach architecture to reduce lifecycle costs.
• The goal is to deliver high-quality, energy-efficient facilities, reducing construction and lifecycle costs by 20% or more and timelines by 30% or more.