AI Summary
Description
Solicitation: Station San Diego Kitchen Renovation Set-Aside: Total Small Business Set-Aside (FAR Subpart 19.5) Location: USCG Station San Diego, Building F (Kitchen), 2170 N. Harbor Drive, San Diego, CA 92101 Evaluation: FAR 52.212-2 - Relevant Past Performance and Price will be used to evaluate bids Important Dates Questions Due: September 16, 2026 Proposals Due: September 21, 2026, by 11:59 PM Eastern Time 1. Project Background and Objective The U.S. Coast Guard requires complete renovations of the kitchen at Station San Diego (Building F). The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to modernize the kitchen space. 2. Scope of Work (Summary) - Please review the attached Statement of Work (SOW) for full technical requirements, safety standards, and applicable codes. The Contractor is responsible for the demolition of existing materials and the installation of new cabinetry, countertops, appliances, and fixtures. Key tasks include: Electrical & Plumbing: Install three (3) new electrical outlets along the SAR Locker Room Wall. Remove the existing garbage disposal and sump pump; furnish and install a new garbage disposal, sump pump, and single-basin stainless steel sink. Cabinetry & Countertops: Furnish and install new kitchen cabinets and countertops along the Window Wall and SAR Locker Room Wall. Install a new countertop for the Kitchen Island. Appliances: Furnish and install a new stainless-steel dishwasher, stove, microwave, and a portable stainless-steel refrigerator. Finishing & Painting: Prepare all wall surfaces (patching, sanding, priming) and paint the entire kitchen space. Testing & Commissioning: Verify load capacity on new breakers, pressure test plumbing lines, and test all appliance functions. 3. Site Conditions & Hazardous Materials An Asbestos and Lead Survey was conducted for this facility (AESS Job No. 26-092). Asbestos: No asbestos was detected in the Station's kitchen (Building F). Lead: Lead was detected at very low concentrations (<0.00151% to <0.00238% by weight) on the east and south walls. Handling & Disposal: Debris and waste generated from the removal of lead-containing materials must be evaluated for appropriate disposal classification (TCLP or TTLC) prior to off-site disposal. Government dumpsters shall not be used. Contractor shall provide their own dumpster(s). Storage – In the past contractors have brought Connex boxes to store their tools and materials. This system has worked out well since Station is very limited on secure storage space. Base Access - Request contractors get vetted through the Command Security Officer for unrestricted access. A list will be provided to the PM to route to the CSO. If this is not completed contractors will require a Station Member stay on scene with them. Due to the unpredictability of operations, we cannot accommodate that. 4. Period of Performance and Hours All work shall be completed within 60 cal…
Classification
Place of Performance
Contracting Office
Contacts