Description
Project Title: Plating Shop Renovation – Hill AFB, Utah Sponsor: U.S. Air Force Executing Agency: U.S. Army Corps of Engineers, Sacramento District (SPK) Project Type: Renovation and New Construction Delivery Method: Design-Bid-Build (DBB) Contract Type: Firm-Fixed Price (FFP), Single Award Task Order Contract (SATOC) Ordering Period: 1,825 calendar days (5 years) Bonding: Required at the task order level for awarded/active work only Location: Buildings 505 & 507, Hill AFB, Utah Estimated Magnitude of Construction: $100,000,000 – $250,000,000 Purpose of Industry Day The U.S. Army Corps of Engineers, Sacramento District – Utah Satellite Office is conducting an Industry Day to provide interested Offerors with a clear understanding of the Government's requirements and project timelines. The event will: Present upcoming project requirements and anticipated milestones. Facilitate Q&A sessions to address technical, schedule, and procurement questions. Promote networking between industry representatives and the USACE Hill Team. Provide a tour of the Plating Shop. Key USACE Staff Available: Project Manager, Technical Lead, Discipline Design Leads, Environmental Leads, and Contracting Officers. Project Overview The Plating Shop Renovation project will modernize and expand existing facilities located in Building 505 (B505) and Building 507 (B507) at Hill AFB, Utah, ensuring continued depot-level maintenance capability for multiple aircraft platforms. The renovation addresses compliance with OSHA and environmental standards, enhances safety and ergonomics, improves energy efficiency, reduces maintenance costs, and provides a robust, modernized facility to ensure reliable aircraft part finishing in support of Air Force readiness. The project includes both the comprehensive renovation of 20,000 square feet of existing shop space and the construction of a new 2,800-square-foot Pre-Engineered Metal Building (PEMB) to accommodate expanded operations. Renovation – Building 505/507 (20,000 SF) Structural Upgrades: Reinforce basement slabs, footings, and CMU walls. Replace structural platforms, columns, and grating for plating tanks. Modify roof structure to support overhead cranes. Mechanical & Process Systems: Replace HVAC and ventilation systems for chemical processes and fume exhaust. Refurbish chemical-resistant coatings on floors, walls, and ceilings. Electrical & Controls: Upgrade panelboards, busways, circuits, instrumentation, and lighting to support automated, traceable plating operations. Fire & Life Safety: Install updated fire suppression systems, emergency eyewash/shower stations, and life safety signage. Key Plating Processes: Electroless Nickel Cadmium Plating Chrome and High Velocity Oxygen Fuel (HVOF) Strip Chrome Plating Anodize / Alodine (Type II & III) Zinc Nickel Plating Nickel Sulfamate Plating Phosphate / Temper Etch / Passivate Aluminum Conversion Coat Titanium Pickle Fluorescent Penetrant Inspection (FPI) Aqueous Degrease / Future Lines Ne…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)