AI Summary
Description
The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for design-bid-build (DBB) construction services to renovate three (3) pumping stations (the Named Pumping Plants (NPPs)) in the Natomas region of Sacramento, California (CA). In general, the work for each site is anticipated to consist of removing the discharge pipes that currently go through the levee and installing new discharge piping that will traverse over the levee. Elkhorn Pumping Plant is an irrigation pumping plant located on the Sacramento River north of Interstate 5 and west of Highway 99 along the Garden Highway Levee at River Mile 73.6. The plant conveys water from the Sacramento River into the Natomas Mutual Water Company's (NMWC) Elkhorn Irrigation System. The work at this site is anticipated to include levee excavation, removal of existing piping and appurtenances, levee embankment backfill and compaction, installation of new piping, build up area, removal and replacement of a portion of Garden Highway pavement, installation of vacuum system and conduit, and replacement of fiber optic line conduit. Riverside Pumping Plant is an irrigation pumping plant located on the Sacramento River north of Interstate 5 and west of Highway 99 along the Garden Highway Levee at River Mile 65.78 (Natomas Reach B). The plant conveys water from the Sacramento River into the NCMWC's Riverside Irrigation Canal. The work at this site is anticipated to include levee excavation, removal of existing piping and appurtenances, levee embankment backfill and compaction, installation of new piping, modification of existing maintenance ramp, removal and replacement of a portion of Garden Highway pavement, installation of vacuum system and conduit, and installation of underground conduit. Pritchard Pumping Plant is an irrigation pumping plant located on the Sacramento River north of Interstate 5 and west of Highway 99 along the Garden Highway Levee at River Mile 75.0/Levee Mile 5.82 (Natomas Reach C). The plant conveys water from the Sacramento River into the NCMWC's Elkhorn Irrigation Canal. The work at this site is anticipated to include levee excavation, removal of existing piping and appurtenances, levee embankment backfill and compaction, installation of new piping, installation of vacuum system and conduit, and replacement of fiber optic line conduit. The Government estimates that construction of the requirement can be completed within one-thousand-ninety-five (1095) calendar days from Contractor receipt of Notice to Proceed, with construction occurring sequentially over three (3) years at a rate of one (1) plant per construction season. This project will require Cybersecurity Maturity Model Certification (CMMC) Level 1 Self Certification. The Government estimates the target price range of the project to be between $10,000,000.00 and $13,000,000.00. The Government intends to solicit the requirement as an Invitation for Bids (IFB) that will result…
Classification
Place of Performance
Contracting Office
Contacts