AI Summary
Description
W912HN26BA007 Construct New Air Traffic Control Tower and Base OPS Robins Air Base, GA The U.S. Army Corps of Engineers {USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN26BA007 for Project Number: UHHZ063000, Construct New Air Traffic Control Tower and Base OPS, Robins Air Base, GA Note: The subsequent solicitation will result in a C-Type Stand-alone contract. Type of Contract & NAICS: This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220 – Commercial and Institutional Building Construction , with a Small Business size standard of $45M. Product Service Code: Y1BA– Construction of Air Traffic Control Towers Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside. Construction Magnitude: In accordance with DFAR 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $40,000,000. Site Visit: An organized site visit has been scheduled for-- 7 July 2026 from 10:00-12:30 Contractors will meet in the parking lot across from Building 2336 at the corner of Mustang St and Eagle Ave. Contractors interested in attending the site visit need to email Dedrick Smith (Dedrick. J.Smith@usace.army.mil) the completed "Badge Request Memo Template" with all attendee information no later than noon on 23 June 2026. The "Badge Request Memo Template" is uploaded as an attachment on the PIEE solicitation. Ensure names provided match the ID that will be presented exactly. The Government cannot guarantee that requests sent after 23 June 2026 will be processed in time to allow access to site. Pickup access passes at the Watson Blvd Visitor Center. Two forms of ID are required at the Visitor Center. A list of acceptable forms of ID is uploaded as an attachment on the PIEE solicitation. Visit Center hours are 07:15 - 16:30. Solicitation Due Date: 23 July 2026 at 1100hours via the PIEE Solicitation Module. Bid Opening will be conducted via MS Teams at 1200 hours. Link to the Virtual Bid Opening will be provided one day prior to the bid opening. Period of Performance: The period of performance including all options is 900 Calendar Days after the issuance of the notice to proceed. Project Scope: All work necessary to construct a new Air Traffic Control Tower consists of reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, load-bearing masonry for the ground floor and structural steel frame for the tower and sloped standing seam metal roof. Functional areas include offices for personnel, training and briefing area, ready/breakroom, simulator room, elevator, mechanical/electrical/communications rooms, storage area, restrooms, and control cab. The new facility will include appropriate power, 750KW backup generator, heating ventilation and air conditioning, fire and lighting protection, and…
Classification
Contracting Office
Contacts