AI Summary
Description
70Z0G126SNY0002NP_M&R BUILDING 205 SSO LOCKER AT U.S. COAST GUARD, SECTOR NEW YORK, STATEN ISLAND This synopsis is issued in accordance with FAR Part 14 and 19. This acquisition is a 1 00% Set-Aside to Small Businesses . The applicable NAICS Code is 236220 – Commercial and Institutional Building Construction with a Small Business Size Standard of $45.0 Million. The Product Service Code is Z2AZ Repair or Alteration of Other Administration Facilities and Service Buildings. The United States Coast Guard has a design/build requirement for the repair of the 3,200 sf Safety & Security Operations (SSO) Locker which serves as the sole ready gear locker/wet room facility located at the Fort Wadsworth Coast Guard Facility, Building 205, U.S. Coast Guard Sector New York, Staten Island, New York. Scope of Work Design Services : To provide all services as specified in the Specifications, including the design and repair/replacement of building envelope roof membrane & flashing; design and replacement of faux brick façade, to be demolished down to the metal stud and replaced with a new façade, entry stairs, doors, and railings shall be demolished and replaced. Building 205 experienced water intrusion issues at both the exterior and interior of the building which requires repair. All work is detailed in the Specifications, however, an overview of the work includes determining requirements for the following: repairing water intrusion through roof and horizontal exterior wall surfaces, a new exterior roof membrane & flashing be demolished and placed with in-kind materials, complete demolition of existing of the existing brick veneer façade down the metal stud framing, provide full specification for the exterior wall assembly, including the vinyl siding system, substrate and all necessary accessories to ensure watertight and low-maintenance façade, for wall insulation, flooring insulation, seal windows, penetrations, sills, & sill plantes appropriately for maximum energy efficiently, flooring insulation, replace existing floor insulation & replacement, roof insulation, exterior stairs showing signs of rot; exterior stairs, and determine requirements for exterior stairs, doors and railings showing signs of rot, prepare construction drawings to completely indicate and specify the location and arrangement of all items described in Design Services. Construction : The specific work is to provide incidental interior and exterior general construction, including interior and exterior flooring and wall assemblies, wall assembly demolition and construction, painting and finish work. Restore disturbed surfaces to pre-construction condition, provide 2 temporary trailers, that combined, provide the same size as the current Bldg. 205/SSO locker room, including all utility services, including natural gas, electricity, domestic water and sanitary waste, includes providing temporary power service through the local power company, provide te…
Classification
Place of Performance
Contracting Office
Contacts