AI Summary
Description
Project Number: 630A4-25-200 Project Title: Refurbish & upgrade the laundry ventilation system at St. Albans Scope of work Performance Period: 240 CALENDAR DAYS FROM NTP Description of Work: Provide refurbish and part equivalent replacement of existing four HV Units and 7 Exhaust fans serve the laundry operation and small capacity AC units for the staff breakrooms to support the laundry building 173 located at the Veterans Affairs Medical Center,179-00 Linden Blvd, Jamaica, NY 11425 in accordance with manufacturer specifications and VA specifications at http://www.cfm.va.gov/til/specs.asp. Work shall meet all VA design guidelines and requirements. This work shall include, but not be limited to, all necessary labor and Materials to perform all Mechanical, electrical, Plumbing, and other related trade work for a complete restoration and functional system. The contractor will perform a mandated walkthrough to verify the site condition and notify the Contractor Officer during the bidding process of any observations and comments not included in the following outlined SOW below: HV-1 Provide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements. Provide all necessary labor and materials to conduct full cleaning, repair, and/or replacement of the interior components and lubrication. Provide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper. Provide all necessary labor and materials to install new filters Provide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control. Provide all necessary labor and materials to install the new fire damper/automatic damper as required. Replace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD Provide and install a new digital local control system interlocked with the exhaust system and the space temperature. HV-2 Provide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements. Provide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication. Provide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper. Provide all necessary labor and materials to i…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)