Description
CONTACT INFORMATION|4|N97113D|FBA|+1 771-229-0462|jennifer.l.henry73.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|N/A|TBD|N00104|TBD|TBD|Invoice and Receiving Report|N/A|N/A|N/A|TBD|N/A|N/A|N/A|N/A|navsupwawf.wss.ftc@us.navy.mil| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| The purpose of this amendment is to increase the quantity requirement by 2 from 30 to 32. N63402 from 15 to 16 N68733 from 15 to 16 All other requirements remain the same. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY_______90________DAYS. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited inthe mail, transmitted by facsimile, or sent by other electronic commerce methodsuch as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture of the FLUX,SOLDERING . 2. APPLICABLE DOCUMENTS DOCUMENT REF DATA=J-STD-006 | | | |950505|A| | | 3. REQUIREMENTS 3.1 Manufacturing and Design - The FLUX,SOLDERING furnished under this contract/purchase order shall meet the material and physical requirements as specified ;for part number M14256RMA-L, CAGE 81349; . 3.2 Marking - Unless marking requirements are specified by a document or drawing cited in this solicitation all items delivered under this contract/purchase order shall be marked and identified in accordance with the applicable Military Standards and Specifications as follows: Mechanical Parts, Assemblies and Equipments - MIL-STD-130 Electrical and Electronic Parts - MIL-STD-1285, Method 1. Electrical and Electronic Parts and Assemblies not covered by MIL-STD-1285-use MIL-STD-130. Electronic Equipment - MIL-STD-454 Requirement Number 67. Electrical Equipment - MIL-P-15024/5 (SHIPS) 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shal…
Classification
Contracting Office
Contacts