AI Summary
Description
This project provides the necessary upgrades to building #203 aircraft engine shop, to maintain the required number of new C130J aircraft engines and propellers to support the YARS mission. The renovations to building 203 include the construction of enclosed areas within the existing workshop, facilitating the ability to maintain and store engines on stands, as well as a room to perform repairs of the J-model propeller blades. These rooms will be temperature and humidity-controlled to meet storage and repair requirements. Reference attachments for Statement of Work and Specifications
Classification
Place of Performance
Contracting Office
Contacts