Description
Model 68FM-300 Floor Mounted Materials Testing System, Force Capacity 300 kN (30,600 kgf, 67,500 lbf) Dual column �oor mounted electromechanical testing system including:1. Integrated digital closed-loop control and data acquisition electronics including crosshead extension and load measurement channels (two optional strain channels can be added to software-based systems)2. Automatic recognition and calibration of transducers3. Pre-loaded balls crew drive and crosshead guidance system powered by a bush-less AC servomotor4. Ergonomic handset with two programmable soft keys, start, stop and return functions, variable speed jog and specimen protection5. User selectable system of units: SI, metric and US customary6. Operator protects architecture7. Auto positioning8. Collision mitigation9. Testing Speed Range 0.00005 to 560 mm/min (0.000002 in/min to 22 in/min)10. Crosshead return speed 640 mm/min (25 in/min)11. Type IIF LH (M48 x 2 threaded hole) base �tting12. CE mark conformity10-Year Mechanical Systems Warranty English language option Tall Height Load Frame Support Base for Models 68FM-100 and 68FM-300 Load FrameHeight of testing platform is approximately 748 mm (29.4 in), which is 300 mm (11.8 in) over Standard Height. Provides shelf area with capacity rating of 100 kg 220 lbs. evenly distributed. 13. 1 Phase 208 VAC - North America Plug: NEMA L6-20P Maximum Crosshead Travel: 1359 mm (53.5 in)Total System Height for Standard Base: 2287 mm (90 in) Total System Height for Tall Base: 2587 mm (101.9 in) Horizontal test space 575 mm (22.6 in)System footprint (W x D): 1140 mm x 786 mm (44.8 in x 30.9 in) No Pneumatic Air Control Kit Static Load Cell: 300 kN (30,600 kgf, 67,500 lbf) - Type II 14. Tension and Compression15. Type IIF �tting (M48 x 2 LH threaded hole)16. Bolt-on design with self identi�cation and electrical calibrationSystem installation and training Installation performed by an Instron factory and �eld trained Service Engineer Representative. The introduction system can be provided for up to 3 operators. For larger numbers of operators, Instron Training classes are recommended. Some or all the following activities will be performed subject to the system quoted and system con�guration:a. Set up of systemb. Safety awareness and general testing safety precautionsc. Make all physical and electrical connections, except 3 phase power and waterd. Mount, install and test all peripheral �xtures and transducers, environmental chambers, and any major accessories that are supplied with the systeme. Check correct operation of the system.f. Check correct operation of all electrical components and mechanical assemblies and transducers (where �tted)g. Con�gure controller and test for correct operation including all adjustments and tuning (includes Console software for Dynamic systems)h. General instruction associated with any hardware elements of the systemi. Review basic operation manuals and any other related documentationj. Calibration and veri�catio…
Classification
Place of Performance
Contracting Office
Contacts