AI Summary
Description
I. DESCRIPTION This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with (IAW) FAR Overhaul (RFO) part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. Solicitation number FA700026Q0058 is issued as a request for quotation (RFQ) for the dismantling, removing, and disposing of an obsolete government-owned Cascade Wind Tunnel (CWT), associated duct work, and HVAC system located at the United States Air Force Academy (USAFA), Colorado. This acquisition is 100% set-aside for small business concerns. The North American Industry Classification System (NAICS) code is 238290 and the small business size standard is $22M. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. NOTICE TO VENDORS Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date, with no obligation to reimburse any vendor for any costs. II. CONTRACT LINE-ITEM NUMBERS (CLINs) are firm-fixed-price (FFP) as shown below. Item Description Qty Unit Unit Price Total Amount 0001 Cascade Wind Tunnel Removal 1 Job $________ $__________ 0002 Electrical Safing 1 Job $________ $__________ 0003 Disposal Fees 1 Lot $________ $__________ TOTAL $__________ III. DESCRIPTION OF SERVICE The United States Air Force Academy, Colorado, requires a contractor to provide all labor, supervision, tools, materials, and equipment necessary to dismantle, remove, and dispose of an obsolete government-owned Cascade Wind Tunnel (CWT), associated duct work, and HVAC system IAW the attached Performance Work Statement (PWS). Key tasks include but are not limited to: Draining of all system fluids, including any oils, coolants, or hydraulic fluids, prior to disassembly. Disassembling and removing the CWT, mounting frames, HVAC unit, and ductwork including the removal of all associated hardware, fasteners, and support structures from the floors, walls, and ceiling. Safely tracing, disconnecting, Lock-Out/Tag-out (LOTO), terminating, capping, and securing all mechanical and electrical utility connections formerly supplying the CWT and HVAC systems. Removing all dismantling debris and disposing of the equipment as scrap, providing the Government with certified weight tickets. The Contractor is solely responsible for identifying, obtaining, and maintaining all permits, licenses, and certifi…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (5)