AI Summary
Description
REQUEST FOR INFORMATION (RFI) Inspection, Monthly Maintenance, and Repair of Fire Protection, Alarm Systems, and Equipment (Extinguishers, etc.) In accordance with Federal Acquisition Regulation (FAR) Part 15 and the FAR Overhaul Guidelines (Executive Order 14275, "Restoring Common Sense to Federal Procurement") , this Request for Information (RFI) is issued solely for market research and planning purposes. It does not constitute a Request for Proposal (RFP) or a commitment to issue a solicitation in the future. The U.S. Coast Guard (USCG) is seeking feedback from qualified, certified, and interested businesses to identify potential sources capable of performing comprehensive inspection, maintenance, testing, and repair services for various fire protection and alarm systems across multiple buildings at Sector San Diego and Helicopter Hangars. This RFI is streamlined to promote early, open, and efficient exchanges with industry before any formal solicitation is released. SCOPE The following is a summary of the scope of work. The full document will be included in the attachments. The selected contractor must provide all labor, materials, equipment, and certifications required to perform monthly, quarterly, semi-annual, and annual inspections, operational testing, preventative maintenance, and emergency repairs for fire protection and alarm systems at the following locations: USCG Sector San Diego: 2710 North Harbor Drive, San Diego, CA 92101 (Buildings A, B, C, D, E, F, G, H, I, and outside HAZMAT/flammable storage lockers). CG Moorings at Ballast Point / Naval Base Point Loma: Kerrick Rd. Bldg 5, San Diego, CA 92106 (Three buildings, dock, and storage areas). Major Systems and Equipment Inventory: Fire Alarm & Detection Systems: 6 Fire Alarm Control Panels (Silent Knight / Harrington Signal), 2 Annunciators, 190 Smoke Detectors, 17 Heat Detectors, and over 170 horn/strobe notification appliances. Special Hazard Suppression Systems: 6 Ansul IND-X Dry Chemical systems (HAZMAT/flammable storage). 2 FM-200 clean agent systems (JHOC OPCEN & COMCEN). 2 Chemguard C2 Foam systems (Hangars 1 & 2). 1 R-102 Wet Chemical kitchen hood system with Range Guard and Gaylord Hood (Galley, Building B). Water-Based Sprinkler Systems: 5 Wet/Dry Fire Main Sprinkler Systems (including 6 risers, flow/tamper switches, and pre-action activation systems). Portable Fire Extinguishers: Inspection, testing, maintenance, and hydrostatic testing of approximately 143 portable fire extinguishers (varying sizes: 2.5 lb to 150 lb, ABC, BC, CO2, Halon, and Class K). Key Performance & Qualification Requirements: Certifications: All technicians performing scheduled maintenance, testing, and repairs must be certified by Silent Knight and Harrington Signal Inc. In addition, FAA and San Diego County Certifications will be required. Proof of certifications must be submitted prior to award. Priority Response: The contractor must provide priority response for emergency trouble calls, arrivi…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)