AI Summary
Description
THIS IS A SOURCES SOUGHT ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. The intent of this notice is to identify qualified, experienced, and interested offerors capable of performing the type of work as described herein for information and planning purposes. The information received will be utilized within the Navy to facilitate the planning and decision making process and will not be disclosed outside of the agency. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. In accordance with Federal Acquisition Regulation (FAR) 15.101(c), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. BACKGROUND INFORMATION: United States Naval Hospital (USNH) Yokosuka, located at Commander Fleet Activities Yokosuka (CFAY) in Japan, has identified the need to renovate the Emergency Department, Inpatient Pharmacy, Radiology, Sterile Processing Department, Surgery Suites, and the Laboratory in order to improve the flow and functionality of operations. The scope of work will include civil, landscape architecture, architecture, interior design, structural, heating, ventilation, and air conditioning (HVAC), plumbing, electrical, communications, cybersecurity, fire protection, including life safety, physical security, antiterrorism / force protection (AT/FP), hazardous material abatement, sustainability, and energy conservation compliance design. GENERAL INFORMATION: Naval Facilities Engineering Systems Command (NAVFAC) Far East (FE), Core Execution Team (CET), is seeking potential sources for a Design-Bid-Build (DBB) construction project at USNH Yokosuka in Japan. The magnitude of this construction project is between $100,000,000 and $250,000,000 or Japanese Yen equivalent. The construction project will consist of the following three packages: Package A – Electrical Infrastructure Package B – Building 1400/1407 Alterations Package C – Building 1400 Operating Room See Enclosure (1) Description of Proposed Construction for more information on the scope of work for all three packages. The following constraints may be anticipated: Package A is the base bid work and must be completed before portions of work under Packages B and C can begin. Packages B and C are option items to be funded and exercised after contract award. Packages B and C may be performed concurrently. The Contractor shall furnish all labor, management, supervision, tools, materials, equipment, incidental engineering, temporary facilities, and transportation necessary to perform alterations of multiple departments in the existing USNH Yokosuka. The proposed scope of work includes, but is not limited to, office renovation, building demolition, built-in equipment repair/replacement, piping repair/replacement, pipe lagging, electrical work, mechanical work, carpentry work, road pavement, fencing, roofing, painting, …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)