AI Summary
Description
Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.
Classification
Place of Performance
Contracting Office
Contacts