AI Summary
Description
Installation of Air Compressor and Steam Cleaner LRC, Bldg 8411, Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ Solicitation No. W15QKN-26-Q-A109 Request for Quote (RFQ) Contract Type Firm-Fixed-Price (FFP) Single-award commercial construction/installation Set-Aside Status - 100% Total HUBZone Small Business NAICS: 238290 (Other Building Equipment) | Size Standard: $25.5M Bonding / Security Alternative Payment Protections (FAR 28.102-1(b)) Pre-award bid bonds and standard 100% P&P bonds are waived. Period of Performance 60 Calendar Days Mandatory Labor Rates Davis-Bacon Act Prevailing Wages, Burlington County Building WD NJ20260027 (issued May 18, 2026) Questions Deadline June 27, 2026, at 13:00 Local Time Submitted in writing via email to CS and Technical POC Proposal Deadline June 30, 2026 100% Electronic Submission via Email to CS Primary Contact (CS) Nelia Shyshak, Contract Specialist nelia.shyshak.civ@army.mil Summary of What the Contractor Shall Provide To be deemed technically acceptable and responsive, the successful contractor must deliver the physical installations and technical deliverables detailed below: Physical Installations & Specialty Trade Services (GFP Integration): Hotsy Steam Cleaner (GFP): Position and secure one (1) Government-owned Hotsy Steam Cleaner (Model 5762SS 208, SN 11096540 100120) in the designated wash bay of Bldg 8411, JB MDL. Make all final natural gas (1/2 psig, 5.0" WC manifold pressure) and electrical utility connections. Air Compressor (GFP): Position and secure one (1) Government-owned Air Compressor in the designated location within Bldg 8411, JB MDL, including installing vibration pads, mounting hardware, and anchoring. Electrical Installations: Install approximately 190 feet of feed wire and conduit from the existing electrical panel to the steam cleaner. Replace the existing circuit breaker with a properly sized breaker. Terminate and secure all obsolete wiring/conduit. Install a local disconnect switch for the air compressor. Integrate a fusible link, surge protective device (SPD), or equivalent into the electrical panel or disconnect. Gas Piping Installations: Install approximately 30 feet of natural gas piping from the ceiling to the steam cleaner equipment, including all fittings, supports, shutoff valves, and unions. Testing and Commissioning: Perform comprehensive leak testing of gas piping, verify electrical voltage and amperage ratings, test the SPD, verify burner operation and pump performance, and execute full startup, calibration, and operational testing. Mandatory Technical Submittals & Deliverables (SOW Section 10.0): Onsite Survey Report (submitted and approved by Government prior to starting any physical work) As-Built Drawings and Wiring Diagrams Surge Protection Documentation Test and Commissioning Report Gas Leak Test Results Electrical Verification Documentation / Reports Manufacturer-compliant Warranty Documentation Completed Cost Breakdown Form (Attachment 0003): Itemized breakd…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (4)