AI Summary
Description
Note: See revised SOW attached. ------------------------------------------------------------------------------------- Note: Due date for proposals is extended to August 21, 2026. Due date for questions is extended to August 3, 2026. The 3PM deadline remains the same. ------------------------------------------------------------------------------------- Note: Time for site visited has been corrected to 10AM Arizona Time. -------------------------------------------------------------------------------------- The USIBWC is issuing a Solicitation (negotiated) for the design and construction (design-build) of the Sludge Dryer Building within the USIBWC's Nogales International Wastewater Treatment Plant Project, in Rio Rico, Santa Cruz County, Arizona. This new building shall house the sludge dryer purchased for the plant. Description of the Work: Work as noted in the SOW: The project includes: Design and construction of a new building to accommodate the sludge dryer system and associated equipment. Demolition of the existing belt filter presses and related polymer system components (excluding concrete foundations, overhead structure, and electrical motor control centers). Relocation of an existing three-sided metal structure. All associated site work, utilities, permitting, and commissioning to deliver a fully operational, code-compliant, and ready-to-use facility. The final product shall be a fully commissioned, turn-key building with all required utilities (water, sanitary sewer, communications, electrical, fire protection, etc.) and site improvements, ready for immediate use upon completion. 2. Project Location Nogales International Wastewater Treatment Plant Santa Cruz County, Arizona (31°26'56.58"N, 110°57'49.33"W) 3. Procurement Approach Type: Design-Build (DB) Contract Structure: Firm Fixed Price Period of Performance: 365 calendar days after Notice to Proceed (NTP) Set-Aside: The Government anticipates a small business set-aside, subject to market research results. 4. Scope of Work Highlights Phase 1: Design Site investigation, surveying, geotechnical investigations, and design development. Preparation of construction documents, technical specifications, and all required reports. Coordination with stakeholders and regulatory agencies. Phase 2: Construction Site preparation, demolition, and relocation activities. Construction of the new sludge dryer building and installation of all required systems. Quality control testing, commissioning, and project closeout. Compliance: All work must comply with federal, state, and local codes, including NEPA, OSHA, ADA/ABAAS, and applicable environmental and safety regulations. The contractor is responsible for all required permits and coordination with utility providers. 5. Submission Requirements (When Solicitation is Issued) Interested offerors will be required to submit: Qualifications and relevant experience with similar design-build projects. Technical approach and project management pla…
Classification
Place of Performance
Contracting Office
Contacts