AI Summary
Description
Amendment 0003 (20 August 2026): The purpose of this amendment is to attach: 1. Repair Water Tower B738 - Question & Answers Rev. 001 2. Revised 1442 Solicitation document Amendment 0002 (14 August 2026): The purpose of this amendment is to attach: 1. Repair Water Tower B738 - Questions and Answers 2. 26-7001 - Repair Water Tower Specs Sheet and SOW - Amended 3. JGCU 26-7001 Updated Drawings 4. Pricing Schedule, which replaces the previous "Bid Schedule" 5. 26-7001 Elevated Water Storage Tank Photos B738 6. Updated Solicitation document FA303026Q00130002 This solicitation is being extended until 02 September 2026 at 2:00PM(CST). The second pre-quote site visit will take place on Wednesday, 19 August 2026 at 9:00AM (CST) . Questions are due to SSgt Michael McCoy at Michael.McCoy.52@us.af.mil and TSgt Christian Bertram at Christian.Bertram@us.af.mil by Thursday, 20 August 2026 at 9:00AM (CST). Amendment 0001 (24 July 2026): The purpose of this amendment is to: a. Attach the Base Access Letter (BAL) Template “Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.” Project Title: Repair Water Tower B738 Project Location: Goodfellow Air Force Base, San Angelo, Texas NAICS: 237110 Size Standard: $45M PSC: Z2NE Period of Performance: 120 Days after NTP Solicitation number FA303026Q0013 is being issued as a Request for Quotation (RFQ). This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. This project involves repairing and repainting the interior of a 400,000‑gallon multi‑column elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potable‑water standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and long‑term operational reliability of the elevated water storage tank. The contractor shall complete all work IAW the attached Specifications. The magnitude for this requirement is between $500…
Classification
Place of Performance
Contracting Office
Contacts