AI Summary
Description
Synopsis PR: FD20302600131 1. Estimated issue date and estimated closing/response date: Issue: December 4, 2025 Closes: January 3,2026 2. RFP# SPRTA1-26-R-0112 Request for Proposal 3. Service/Spare/Repair/OH: Spares 4. AMC: 3/B 5. Nomenclature/Noun: Actuator, Electro-Me 6. NSN: 1680-01-009-9089 7. PN: 10-60822-4 42089R20 8. History: 12 Jun 2007, 5 each, TRIUMPH GEAR SYSTEMS INC. (82402) 9. Description/Function: Actuator, Electro-Me. DIMENSIONS, 7.6250 INCH (L) BY 5.8125 INCH (W) BY 8.7500 INCH (H). 7.4400 POUNDS (WEIGHT). MATERIAL CONTENT, ALUM CASTINGS AND STEEL MILLED PARTS. THE STABLIZER BRAKE AY HAS ALMOST ALL WORKING PARTS ENCLOSED WITHIN ITS HOUSING. THE EXCEPTIONS ARE: THE BRAKE SHAFT (PART OF THE BRAKE AY); THE ELEVATOR IMPUT SHAFT AND ELEVATOR LEVER LEVER; AND THE OVER-RIDE SHAFT AND OVERRIDE LEVER.. APPL. TO E-3 AND KC-135. 10. Total Line Item Quantity: L/I 0001 38 Each (Range: 10-57) 11. Application (Engine or Aircraft): E-3 AND KC-135 12. Destination: L/I 0001 Ship to SW3211, Tinker AFB, Oklahoma 13. Required Delivery: Deliver 3 unit(s) on 06 APR 2027. Deliver 3 unit(s) on 06 MAY 2027. Deliver 3 unit(s) on 06 JUN 2027. Deliver 3 unit(s) on 06 JUL 2027. Deliver 3 unit(s) on 06 AUG 2027. Deliver 3 unit(s) on 06 SEP 2027. Deliver 3 unit(s) on 06 OCT 2027. Deliver 3 unit(s) on 06 NOV 2027. Deliver 3 unit(s) on 06 DEC 2027. Deliver 3 unit(s) on 06 JAN 2028. Deliver 3 unit(s) on 06 FEB 2028. Deliver 3 unit(s) on 06 MAR 2028. Deliver 2 unit(s) on 06 APR 2028. 14. Qualification Requirements: Do not exist. 15. Export Control Requirements: No 16. UID: UID requirements will apply. 17. Qualified Sources: TRIUMPH GEAR SYSTEMS INC. (CAGE 82402) 18. Set-aside: This acquisition will not be set aside. 19. Surplus: Surplus is not authorized. 20. Mandatory Language: The Government does not own the data or the rights to the data needed to manufacture this item. Firms interested in participating in this procurement are encouraged to contact the OEM to inquire about the data or rights to the data. In accordance with FAR 5.207(c) (16) (i), all responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Foreign owned firms are advised to contact the contracting officer or program manager before submitting a proposal to determine whether there are restrictions …
Classification
Contracting Office
Contacts
Attachments (1)