AI Summary
Description
FOLS, Replace Alarm System & Electrical Panel The purpose of this amendment is to update/remove the language in section the following sections. 1. Section L, Checklist for Quote Submittal, The Prior Experience requirement references "mill and overlay repair work for flexible pavement," which does not appear relevant to this solicitation's scope and is being removed. 2. Section C, Specifications/Drawings, The project work description references "removal of the existing staircase structure and complete installation of an in-kind metal staircase replacement with a primer finish only," which also does not appear relevant to this solicitation's scope and is being removed. This section should read: ¿Work will consist of providing all labor, materials, tools and other equipment necessary to Replace the main 400 amperage electrical distribution panel in the park visitor center. The new panel will replace an existing panel installed in 1974 servicing the park headquarters, visitor center and museum facility. A temporary electrical service panel will be needed while work to replace the panel is installed and tested.¿ The bid due date is being change from 04-JUN-26 changed to 10-JUN-26. All other solicitation terms and conditions remain unchanged.
Classification
Place of Performance
Contracting Office
Contacts