NAICS 221310 – Water Supply and Irrigation Systems
Sol # 36C24826Q0862
Description
This amendment revises the evaluation criteria contained in the solicitation. The original evaluation criteria are hereby deleted and replaced in their entirety with the revised with the Evaluation Criteria attached to this amendment. The Government will evaluate quotations using a comparative analysis in accordance with FAR Part 12 commercial procedures. 2. This amendment also corrects an administrative discrepancy regarding the solicitation closing date. Although the solicitation document identified a quotation due date of July 13, 2026, the closing date displayed on SAM.gov inadvertently reflected July 10, 2026. To eliminate any ambiguity and ensure all prospective offerors are provided an equal opportunity to compete, the official quotation due date is hereby established as: Monday, July 13, 2026, at 4:30 PM Eastern Time. The SAM.gov posting will be updated to reflect the correct closing date. 3. Offerors shall acknowledge receipt of this amendment when submitting their quotations. 4. Except as modified herein, all other terms, conditions, and requirements of the solicitation remain unchanged. EVALUATION CRITERIA Basis for Award The Government intends to award a single firm-fixed-price contract to the responsible quoter whose quotation represents the best value to the Government based on a comparative analysis of quotations received. Award will be made using the procedures of FAR Part 12 and FAR Part 8.4. The Government will evaluate quotations using a comparative analysis rather than assigning adjectival ratings, numerical scores, or conducting a tradeoff process prescribed by FAR Part 15. The Government reserves the right to award without exchanges. Therefore, quoters are encouraged to submit their best quotation initially. Evaluation Factors Quotations will be evaluated using the following factors: Technical Capability Past Performance Price Technical Capability is more important than Past Performance. When combined, the non-price factors (Technical Capability and Past Performance) are significantly more important than Price. As quotations become more equal under the non-price factors, Price will become increasingly important in the award decision. Technical Capability The Government will evaluate each quotation to determine the extent to which the quoter demonstrates the capability to successfully perform the requirements identified in the Performance Work Statement (PWS). The Government s comparative assessment may include, but is not limited to, the following: Demonstrated experience maintaining deionized (DI), reverse osmosis (RO), humidifier water treatment, ultraviolet (UV) sterilization, and water softening systems. Demonstrated understanding of the preventive maintenance requirements identified in the PWS. Ability to provide qualified Field Service Engineers with appropriate technical experience. Ability to provide required consumables, exchange vessels, replacement components, testing equipment, and contractor-furnished materia…
Classification
NAICS221310
PSC CodeJ046
Place of Performance
AddressDepartment of Veterans Affairs North Florida/South Georgia VHS