Exterior Wall Masonry Repair: The purpose of this project is to perform masonry remediation on the west-facing exterior wall of Building 1, G Section, 3rd Floor. The wall has experienced significant water intrusion due to a fully detached downspout that allowed rainwater to run down the façade, deteriorating the brick and mortar over multiple seasons. Repairs are required to restore the integrity of the building envelope and prevent ongoing moisture penetration. This project shall be completed within Forty-five (45) calendar days once NTP is issued.