AI Summary
AI summary · verify on SAM.gov
Description
DESCRIPTION: The Naval Air Systems Command (NAVAIR) is seeking qualified sources that can provide commercial Depot-level Maintenance, Repair, and Overhaul (MRO) services for the United States Navy (USN) MH-60R/S helicopters at Naval Station (NS) Rota, Spain. The support includes Planned Maintenance Interval (PMI) and In Service Repair (ISR) of the MH-60R and MH-60S aircraft in accordance with the H-60 Integrated Maintenance Plan (IMP). Specific performance requirements include planning, managing, and organizing internal controls which will require furnishing all necessary personnel, access to facilities, equipment, materials, supplies, testing equipment, and management to rework, overhaul, and test items to conform to the IMP and established Turnaround Times (TATs). It is anticipated the Government will award a Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) with a one-year base period and four (4) one-year option periods. This market research tool is being utilized to identify capable firms, of all sizes, prior to finalizing the method of acquisition. This notice should not be construed as a formal solicitation or an obligation on the part of the Government of the United States to acquire any parts or services. Any information provided to the Government is strictly voluntary and at no cost to the Government. REQUIRED CAPABILITIES: The contractor will be required to perform MH-60R/S PMI in alignment with PMA-299 IMP on approximately two to four (2-4) aircraft per year onboard NS Rota, Spain. The anticipated total annual aircraft inductions is an estimate only and subject to change during development of this requirement These PMI events include all MH-60R/S requirements outlined in A1-H60-IMP-000, inspection bulletin compliance, and conducting preventive, corrective, and investigative maintenance. Additionally, completion of Technical Directive (TD) incorporation, In Service Repair (ISR), and maintenance to facilitate Intermediate (I) and Organizational (O) Level requirements will be required. PMI and ISR work include both scheduled and unscheduled requirements: 1. Scheduled Maintenance: PMI-1N and PMI-2N requirement includes airframe, systems, and component inspection through visual and Non-Destructive Inspection (NDI) methods, defect correction, preventative maintenance, operational checkouts, and Technical Directive compliance. The required TAT thresholds for PMI-1N and PMI-2N are 120 and 135 calendar days, respectively. The IMP requirements for aircraft subject to this process are the minimum requirements, formulated and established to the depth required to ensure the reliability, operational availability, safe operation and airworthiness of the aircraft for the duration of the established service period. The IMP will provide depot support throughout the total service life of the aircraft. 2. Unscheduled Maintenance: Unscheduled Maintenance are the tasks that are not related to a specific IMP …
Classification
Place of Performance
Contracting Office
Contacts