Description
See changes to Ohley Hollow Rd. Drawings and to Specification document - updated 6/15/2026. Changes to the Ohley Hollow Road Drawings: Note showing the potential that an abandoned septic tank (unknown location) may be encountered and will need to be decommissioned if it is disturbed. Note showing the location of a pet cemetery and to avoid this location. Note showing a temporary fence must be constructed between the corner of the house and the fence along the road. Changes to the specs: Seeding Spec: Added a different seed mixture for the Ohley site. Added note showing the maximum rock size shall be ½” in top 1-1/2” where the special seedbed preparation is required. Added note specifying compacted and disturbed areas must be loosened and blended into adjacent area to remove depressions. Mob Spec: Added procedure for decommissioning an abandoned septic tank if one is disturbed. Added requirement to remove concrete from chain link posts if they are going to be reused. Added requirement that temporary fence must be constructed at the Ohley site Please see attachments and comibined synopsis solicitaiton for further deatails. Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV. The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.
Classification
Place of Performance
Contracting Office
Contacts