AI Summary
Description
SOURCES SOUGHT SYNOPSIS Project Title: Design and Build Covered Parking Structure for Fighter Aircraft F-35 Notice Type: Sources Sought, ID: HARBSS-2026-03 NAICS Code: 236220 - Commercial and Institutional Building Construction Response Date: 29 Jun 2026, 5:00 PM EST. 1. Introduction This is a Sources Sought Synopsis only. This is not a Request for Proposal (RFP), Request for Quotation (RFQ), or Invitation for Bid (IFB). There is no solicitation available at this time. This notice is issued solely for market research and planning purposes to determine the availability and capability of qualified contractors to perform a Design-Build project for a covered parking structure. 2. Project Description The Government is seeking a Design-Build contractor to design and construct a covered parking structure capable of accommodating two (2) composite-sized fighter aircraft F-35. The structure must be a non-enclosed, standing seam metal roof canopy. Acceptable construction methods for this non-enclosed structure include, but are not limited to: Pre-Engineered Buildings (PEB) Concrete Masonry Unit (CMU) block Tilt-up concrete panels Other approved construction methods meeting the design criteria 3. Specific Design & Engineering Requirements The design and construction must strictly adhere to the following architectural and engineering specifications: Structural & Architectural Design Canopy Design: Multiple-segment cantilevered Gable type rising towards the interior. Support System: Load-bearing structural columns located around the outside perimeter, supporting cantilevered roof joists/space frame extending into the covered interior space. Roofing: Standing seam metal roof. Code & Environmental Compliance Building Codes: Design must comply with Miami-Dade County building requirements. Wind Loads: Calculations shall be conducted In Accordance With (IAW) ASCE/SEI 7-10 and the latest edition of the Florida Building Code for High-Velocity Wind Zones. Hardware & Additional Features Hardware: Except where stainless steel is utilized, all hardware shall be galvanized in accordance with ASTM A 153. Systems & Sitework: The design and build must include: Lightning protection and grounding systems. Pavement striping. Tie-down/mooring points for aircraft securing. 4. Submittal & Deliverable Requirements The Contractor shall be responsible for providing the following design submittal packages to the Contracting Officer (KO) for government review and approval, strictly adhering to ANGETL 24-02 guidelines: Type A2 (35% Design) Type B1 (65% Design) Type B2 (100% Pre-final Design) Type B3 (100% Final Design) 5. Capability Statement Requirements Interested parties are requested to submit a Capability Statement demonstrating their ability to perform the work described above. Submissions should be concise and include the following: Company Profile: Company name, address, Point of Contact (POC), phone number, email address, CAGE Code, and Unique Entity ID (UEI). Business Size & …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)