AI Summary
Description
ADVANCE NOTICE TO INDUSTRY: UPCOMING PROGRESSIVE DESIGN-BUILD OTHER TRANSACTION PROCUREMENT W912HH-26-9-0001 Fort Stewart Building 212 UEPH Barracks Repair by Replacement Pilot Program U.S. Army Corps of Engineers (USACE) – Savannah District Anticipated Release Date: July 28, 2026 Project: PN 111716 Bldg 212 Repair by Replacement, Fort Stewart, Georgia Statutory Authority: 10 U.S.C. § 2808a (Other Transaction Authority for Facility Construction and Repair) NAICS Code: 236220 (Commercial and Institutional Building Construction) PSC Code: Y1FC ( CONSTRUCTION OF TROOP HOUSING FACILITIES ) Anticipated Maximum Value (NTE): $38,000,000 NOTICE PURPOSE & PLANNING CONTEXT The U.S. Army Corps of Engineers (USACE), Savannah District, is issuing this Advance Notice to alert the construction industry, industrialized manufacturers, and modular integrators to an upcoming design-build opportunity. This project will be executed as an Other Transaction Agreement (OTA) under the statutory authority of 10 U.S.C. § 2808a, Facility Construction or Repair. This is NOT a formal solicitation. This notice is for planning purposes only and is non-committal. The official Request for Qualifications (RFQ) / Request for White Papers is anticipated for release on SAM.gov in late July 2026. PROJECT SCOPE This project consists of the design and construction of a new 86-bed Permanent Party Unaccompanied Enlisted Personnel Housing (UEPH) Barracks and the demolition of the existing building 212 at Fort Stewart, GA, after the new barracks has been turned over and completed. The scope includes parallel site preparation, utility infrastructure, factory-based manufacturing, and the procurement and installation of all necessary furniture, furnishings, and equipment (FF&E). The new facility will have a maximum gross area of 41,710 square feet (485 sq ft per occupant) and is intended to provide housing that is functionally and technically comparable to similar private-sector housing. Barracks functional spaces will adhere to the 2025 Army Barracks Standard for Permanent Party Unaccompanied Housing, Junior Enlisted and Junior NCOs Memorandum for square footages, with the exception of the required room module layout. ANTICIPATED TWO-STEP SELECTION PROCESS USACE Savannah District intends to utilize a streamlined, two-step qualifications-based selection (QBS) process to identify the most qualified partner. The information below could change before the final release of the request for white papers. STEP 1: REQUEST FOR QUALIFICATIONS (RFQ) / WHITE PAPERS Interested firms will submit a concise written qualifications package (maximum of 15 pages). Submissions will be evaluated against two main elements: Capability and Experience Relevant Experience : Demonstration of more than two (2) new construction projects of similar size (minimum 30,000 SF) and scope (multi-unit housing, dormitories, barracks). Renovations are not accepted as comparable. Innovation & Speed : Documented use of inno…
Classification
Place of Performance
Contracting Office
Contacts