AI Summary
Description
THIS IS A SOURCES SOUGHT NOTICE . THIS NOTICE IS ISSUED FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT QUALIFICATION DOCUMENTS OR PROPOSALS. SHOULD THIS REQUIREMENT MOVE FORWARD, A SYNOPSIS OF THE PROPOSED CONTRACT ACTION WILL BE POSTED AT A LATER DATE PROVIDING INSTRUCTIONS FOR OFFERORS TO RESPOND TO THIS OPPORTUNITY. Please only respond to this sources sought notice if you are seriously interested and if your company is capable of performing the corresponding work required. The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Terre Haute anticipates the issuance of a solicitation for the award of a firm-fixed-price construction contract for a project titled Repair and Maintain Water Towers at FCI Terre Haute located at 4700 Bureau Rd. South, Terre Haute, IN 47802. The Federal Bureau of Prisons (FBOP), FCI Terre Haute, located at 4700 Bureau Rd. South, Terre Haute, IN 47802, seeks to award a single contract to a qualified and licensed contractor to provide all labor, materials, and engineering services to include the submittal of a comprehensive 100% Design Package for FBOP approval, encompassing technical material specifications for the following; The Contractor shall provide all equipment, tools, specialized materials, skilled labor, competent supervision, safety systems, and incidentals necessary to clean, repair, and test the following two (2) elevated storage structures. Tank A: FCI and FPC Water Tower • Design & Capacity: 600,000-Gallon Spheroid Elevated Tank • Original Fabricator/Year: Pittsburgh Tank (2007) Specific Required Tasks: 1. Exterior Preparation: Perform high-pressure water washing to clear surface contamination. 2. Exterior Coating: Apply a multi-coat commercial-grade exterior urethane system. 3. Dry Interior Remediation: Spot power-tool clean failed coating zones. 4. Dry Interior Coating: Spot-prime and repaint all prepared areas with a specialized epoxy system. 5. Foundation Maintenance: Clean and apply high-durability protection sealant to concrete foundations. Remediate structural voids or failing grout lines beneath the steel baseplate. 6. Overflow Modifications: Furnish and fit an approved, insect/debris-screened flap gate over the overflow outfall. 7. Access Infrastructure: Anchor safety handholds adjacent to the wet interior roof hatch, access tube hatch, and painter's hatch. 8. Rigging Hardware: Weld a certified rigging lug onto the transition cone section above the upper platform hatchway. 9. Expansion Joints: Remove insulation to examine joints. If a glandular-style joint is present, extract it and replace it with an engineered bellows-type expansion joint. 10. Drainage Infrastructure: Install an engineered mud valve within the transition cone. 11. Corrosion Prevention: Test, tune, and systematically maintain the existing cathodic protection system. 12. Roof Barriers: Install a perimeter safety handrail system conforming to updated IDEM guid…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)