AI Summary
Description
Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI Category: Y- Construction of Structures and Facilities - Potential Sources Sought Date Published: June 06, 2026 Contact: Purchasing & Contracting Division, USPFO for Hawaii, 91-1179 Enterprise Ave, Bldg. 117, Kapolei, HI 96707-2150, POC Cezar Y. de Veas SYNOPSIS: KNMD209085: Munitions Maintenance and Inspection (M&I) Facility & KNMD209086: Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI SOURCES SOUGHT. The purpose of this synopsis is to gain knowledge of potential sources for this project including interested Small Business sources. This notice is for planning purposes only. All interested parties should respond. USPFO for Hawaii may issue a solicitation and award of a contract to "Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG” located on Joint Base Pearl Harbor-Hickam (JBPHH), HI. The magnitude of this project(s) (combined) is between $10,000,000 and $25,000,000. Project KNMD209085: Munitions Maintenance and Inspection (M&I) Facility Project square footage is estimated at 2,400 SF. This project involves the construction of a new Munitions Maintenance & Inspection facility utilizing conventional design and construction methods to accommodate the facility mission. Work covered in this project includes, but is not limited to: Micro-pile Foundations: Specialized foundation engineering featuring micro-piles to mitigate challenging soil conditions and ensure seismic structural integrity. Cast-in-Place Concrete: Constructing robust concrete slab-on-grade, concrete walls, capping beams, and associated structural masonry elements. Structural Framing & Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels, and structural steel support systems. Roofing: Installation of high-performance standing seam metal roofing, complete with prefinished gutters, downspouts, and weather barrier wraps. Specialized Systems: Installation of mechanical HVAC systems (including specialized 20-ton air conditioning systems), interior plumbing, lightning/grounding protection, and communication infrastructure. Fire Protection: A complete fire alarm-mass notification system and wet-pipe sprinkler suppression system. Bid Option (MAC Pad): This project includes a bid option for a 1,167 SY concrete pad for the Material Assembly Center (MAC), required for constructing munitions, along with new asphalt pavement for access and egress to the facility's maintenance bays. Project KNMD209086: Conventional Munitions Cube Storage Addition Project square footage is estimated at 1,320 SF This project consists of constructing an addition to the existing Munitions Cube Storage Facility (B3552) utilizing conventional design and construction methods to support the F-22 mission. Work covered in this project includes, but is not limited to: Substructure & Enclosure: Micro-pile foundations, …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)