AI Summary
Description
The Contractor shall provide all plant, labor, equipment, transportation, and tools required to complete a full modernization of the existing two-story elevator system. The primary objective is to replace the elevator car, mechanical pump and control systems, and hoistway doors. The intent is to reuse existing hydraulic jack system in the elevator shaft. Perform all work according to the Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references. This is a sources sought. No award will be made off this posting. This is for market research purposes only. Please review attached SOW for further project details.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)