AI Summary
Description
The purpose of this amendment is to post Questions and Answers to Solicitation 36C24926Q0229 TVHS VFD Replacements Questions and Answers 36C24926Q0229 VFD Replacements Question: Is this is a brand new contract OR if there is (was) an incumbent performing these services. Answer: This is a new contract Question: Is there a scheduled site visit or if one can be arranged? We would appreciate any details you could provide, including the date and time, if applicable. Answer: Site visit will be scheduled and no pictures will be provided. Email Stephen.Browne@va.gov to set up a site visit. Question: Specification Section 5.b requires NICET Level I or NETA Level II certification. Will the Government accept licensed electricians and manufacturer-certified VFD/controls technicians as an equivalent qualification? Answer: Because this a replacement and the systems are tied to the Fire system. You would need electricians and manufacturer-certified VFD/controls technicians as an equivalent qualification? Question: Please confirm whether electrical one-lines, mechanical and electrical plans, existing VFD schedules, control diagrams, BAS point lists, fire alarm interface diagrams, or record/as-built drawings are available for the listed VFD locations. If available, please provide them with amendment. Answer: Because this a replacement we can provide locations and point lists, upon request Question: Please confirm whether photos of the existing VFDs, disconnects, bypasses, conduit entries, mounting locations, BAS/control panels, and related fan room and mechanical room conditions can be provided by amendment. Answer: Because this a replacement we can provide locations and pictures upon request Question: Please confirm whether the Government will schedule a pre-bid site visit or escorted field verification before the quote due date so vendors can review existing VFD locations, mounting conditions, access, conduit entries, control interfaces, and outage constraints. Answer: Outage constraints can be worked by scheduling after contract is awarded. We can set up a pre bid site visit if needed. (See Question 2) Question: The SOW states the facility standard is Danfoss and the technical evaluation subfactor requires Danfoss-manufactured VFDs. Please identify the required Danfoss model, series, or product line and any required options or accessories. Answer: The Danfoss model series would be determined by the size required for the equipment Question: The equipment list specifies a disconnect with bypass for each unit. Please clarify whether the bypass is required to be an integral VFD bypass package, a separate disconnect and bypass assembly, or another specific VA-standard configuration. Answer: Some of the VFDs being replaced are standalone VFDs, these require build in bypass and disconnect. Others are dual systems with added cabinets with disconnects and contactors as interlocks so only one can run at a time. Question: Please provide or clarify the required BAS point …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)