AI Summary
Description
Sources Sought Disclaimer: This Sources Sought is for informational purposes only. This is not a Request for Proposal (RFP) to be submitted. It does not constitute a solicitation and shall not be construed as a commitment by the Government. Responses in any form are not offers and the Government is under no obligation to award a contract as a result of this announcement. Response to this questionnaire is voluntary and no reimbursement will be made for any costs associated with providing information in response to this market survey and any follow-on information requests. Data submitted in response to this market investigation will not be returned. Subject: Sources Sought for retrofit and modernization services for fielded Joint Assault Bridge (JAB). Purpose: The Army Contracting Command – Detroit Arsenal (ACC-DTA), on behalf of the Project Manager Force Projection (PM FP), Product Manager (PdM) Bridging, is issuing this Sources Sought notice as a means of conducting market research to identify parties having an interest in and the resources to support mobile, field-based retrofit and modernization services for fielded JAB systems. The Government will accept capability statements for either the entire requirement or a subset of the requirement that excludes the Add on Armor (AoA) retrofit. Background: The JAB is a heavily armored combat engineer vehicle consisting of an M1A1 Abrams tank chassis integrated with a hydraulic Bridge Launch Mechanism (BLM) designed to launch and retrieve a Heavy Assault Scissor Bridge (HASB). The Government currently has a requirement to "pure-fleet" approximately 120 fielded JAB systems. These systems require the integration of critical Engineering Change Proposals (ECPs) to address obsolescence issues and improve crew survivability. The required retrofits include: Integration of the Mission Ready Tablet (MRT), replacing obsolete components, notably the Launch Control Units (LCU). Installation of Add-on-Armor (AoA) to the BLM. Installation of Hydraulic Power Unit (HPU) Weld Studs and a Hydraulic Parking Brake. Acquisition Timeline: The Government is in the acquisition planning phase for a five-year Firm-Fixed-Price (FFP) contract to execute these retrofits. The target award timeframe is 4th Quarter, Fiscal Year 2027 (4QFY27). Retrofit Requirement: The Contractor will be required to provide highly skilled Field Service Representatives (FSRs) capable of traveling to unit motor pools (Continental United States (CONUS) and Outside the Continental United States (OCONUS)) to perform complex hydraulic integration, heavy armor installation, and system validation. The Contractor must execute these retrofits in austere or standard motor pool environments with fixed facility cranes or overhead lift capability, while coordinating directly with military units to ensure minimal disruption to deployment and training cycles. Proprietary Information: The U.S. Government appreciates the time and effort taken to respond to this sur…
Contracting Office
Contacts
Attachments (1)