AI Summary
Description
Purpose: The purpose of this Request for Information (RFI) is to gauge industry interest, technical capability, and qualifications in support of a possible future contract. The Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) is seeking information from industry regarding the ability and capacity to fabricate the All Up Round plus Canister Simulator (AURCS). The AURCS is a developmental item that has been designed by NUWCDIVNPT. Requirements for the fabrication, testing, and delivery of the AURCS units will be documented in the Statement of Work (SOW), Technical Data Package (TDP), and other Government Furnished Information (GFI). Information on the AURCS can be found in the following RFI attachments. Attachment 1 : AURCS Background Slides Attachment 2: Draft Statement of Work (SOW) NOTE: The RFI attachments are Distribution D, Controlled Unclassified Information (CUI). See below and all attachments for full information and details regarding this RFI. Interested contractors with an active registration in SAM.gov may request access to the attachments section of this solicitation. You must request access to the attachment by clicking on its title and providing the reason you need access. You will not receive immediate access to view the document. The Contracting Office will review your request within SAM.gov to grant or reject your access. A controlled attachment requires special handling due to the information it contains. The requestor must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter. Your entity is responsible for managing the documents if received in accordance with prescribed directives. https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a Future Effort Summary: The following provides a summary of the future AURCS contract effort: 1. A TDP will be provided as GFI at solicitation, which will include the AURCS and Peculiar Support Equipment (PSE) design. Attachment 1 provides an overview of the AURCS and its major subsystems. 2. The anticipated scope of work includes, but is not limited to, the below key tasks. Additional details are in Attachment 2. a. First Article Unit: Fabrication and assembly of an AURCS First Article Unit (FAU) in strict accordance with the TDP. This will include a formal Manufacturing Readiness Review (MRR) prior to fabrication. Acceptance testing and a Physical Configuration Audit (PCA) is to be performed on the FAU to validate the manufacturing process and product compliance to the TDP. The completed FAU will be packaged and shipped to NUWCDIVNPT. b. Re…
Classification
Contracting Office
Contacts