Modification 36C24126Q0728 Intent to Compete SD/VOSB/ RFQ Additional information responses to questions SCI Tent Canopy Rental/ VAMC Brockton: Installation surface: grass, asphalt, or concrete? GRASS Can the tent be staked, or are weights/ballast required? STAKED Are site photos of the Building 8 installation area available? NO, UTILIZE GOOGLE EARTH Are sidewalls required? NO Is lighting required? NO Please confirm approximately 1,000 sq. ft. of subflooring is required. 20 feet x 50 feet flooring system (temporary dance floor or similar system) capable of being installed over reasonably level lawn surface. Contract Specialist Carlos Ortiz carlos.ortiz3@va.gov