Description
SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. Please review the quote and provide your best and final offer for both price and lead-time. Kindly also have the quotation revised to today's date and address the quote to my attention. The follow has been attached for you to complete and review : Representations & Certifications Rider Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023) Drawing_PF-444-161-25_Rev1 SC-700-8660-47 Rev.19 SC-700-866-49 Rev. 5 INJ-98 Rev.6 Quote# Q_6425_Rev_5 Required item(s) listed below : PF-444-161-25_Rev.01: Length of Tube 17.973 inches – QTY: 90 PF-444-161-25_Rev.01: Length of Tube 4.89 inches – QTY: 36 PF-444-161-25_Rev.01: Length of Tube 22.535 inches – QTY: 9 PF-444-161-25_Rev.01: Length of Tube 25.095 inches – QTY: 9 PF-444-161-25_Rev.01: Length of Tube 20.084 inches – QTY: 8 PF-444-161-25_Rev.01: Length of Tube 17.525 inches – QTY: 7 Quote is for product only; no on-site services permitted. Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA). Technical evaluation criteria are as follows: Material: 316L seamless stainless steel, redrawn from tube produced to ASTM A269 OR 347/316L welded tubes shall be made from strip conformed to ASTM A240/A240M, with surface finish per ASTM A480/A480M, Finish 2B or better. Final product to have outside tube diameter shall be 1.875″ +0.000″/−0.007″, and wall thickness shall be 0.012″ ±0.001″. (Drawing PF-444-161-25) Overall cut-tube length deviation shall be within ±0.005″ from the nominal specified value. Tubes shall be straight to a maximum deviation of 0.001″ per 1.0″ of tube length. (Applicable to tubing made of a flat strip only) The weld bead shall be a butt joint fusion TIG weld without the use of filler metal. During welding, an inert gas inside purge shall be used along with an inert gas trailing shield on the outside. Tolerance on weld bead projection after planishing shall not exceed 0.002″. Tubing shall be cut to final length using a method that does not deform or collapse the tube wall, and all resulting sharp edges shall be immediately deburred, producing a maximum radius of 0.005″. (Refer to SC-700-866-49) No silicon or sulfur-based cutting fluids shall be used as machining lubricants. Cutting fluids must be approved, as specified in the latest revision of SC-700-86…
Classification
Place of Performance
Contracting Office
Contacts