AI Summary
Description
Single Project RFP Set-Aside for Small Businesses NAICS Code: 236220 – Commercial and Institutional Building Construction The Hawaii National Guard intends to issue a Request for Proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of “KNMD209087 Construct Egress Shop located on the Hawaii Air National Guard campus, at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. KNMD209087, F-22 Right Size: FY25 Egress Shop F-22, in accordance with Final Design/Construction Documents. This project has a statutory cost limitation of $14M for Unspecified Minor Military Construction (UMMC) Project – Adjustment of Dollar Limitations for Location pursuant to 10 USC §2805. Project Size: 3,200 SF This project involves the construction of a new egress maintenance facility adjacent to the HIANG Squadron Operations Facility, Building 3428. Work covered in this project includes, but is not limited to: Micro-pile Foundations: Specialized foundation engineering featuring micro-piles to mitigate challenging soil conditions and ensure seismic structural integrity. Cast-in-Place Concrete: Constructing robust concrete slab-on-grade, concrete walls, capping beams, and associated structural masonry elements. Structural Framing & Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels, and structural steel support systems. Roofing: Installation of high-performance standing seam metal roofing, complete with prefinished gutters, downspouts, and weather barrier wraps. Specialized Systems: Installation of mechanical HVAC systems (including specialized 20-ton air conditioning systems), interior plumbing, lightning/grounding protection, and communication infrastructure. Fire Protection: A complete fire alarm-mass notification system and wet-pipe sprinkler suppression system. Bid Options: This project includes two bid options: Bid Option 1 (GOX Shelter): This option includes the GOX Canopy Shelter. Bid Option 2 (AGE Ready Pad): This option includes a concrete AGE Ready Pad and associated asphalt pavements to provide access to the new pad. Project Phasing & Security Gates: The contractor will be required to erect a temporary security fence around the construction zone in accordance with the project staging and phasing drawings. Escort Requirements: Escort personnel shall be required when erecting the temporary security fence, performing work occurring outside the temporary security fence, and connecting utilities to the existing system. Secured Zone Access: Once the temporary security fencing is approved and accepted by the Contracting Officer's Representative (COR), no escort shall be required within the active secured work zone during construction, allowing the contractor to work within the secured boundary unimpeded. The magnitude of construction is between $10,000,000 and $25,000,000. The magni…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)