AI Summary
Description
THIS IS A NOTIFICATION OF INTENT TO AWARD A BRAND NAME SPECIFICATION IN A FUTURE CONTRACT FOR CORDELL HULL AND DALE HOLLOW - U.S. ARMY CORPS OF ENGINEERS – NASHVILLE DISTRICT'S NOTICE OF INTENT TO INCLUDE BRAND NAME SPECIFICATION IN A FUTURE CONTRACT FOR SUPPLY AND DELIVERY OF ONE (1) 4-TON AND ONE (1) 6-TON JANUS LOW PRESSURE CARBON DIOXIDE REFRIGERATED STORAGE UNITS – SOLICITATION W912P526QA*** The U.S. Army Corps of Engineers Nashville District will be soliciting a sole source quote for a Single Award Firm Fixed-Price supply contract to The Hiller Companies LLC for the supply and delivery of one (1) 4-Ton Janus Fire Systems® Low Pressure Carbon Dioxide Refrigerated Storage Units with the options to purchase one (1) additional 6-ton tank and two (2) additional 4-ton tanks. The Four-Ton Low Pressure Carbon Dioxide Storage Tank shall be designed to work within the existing footprint of the previous 3.75-ton Ansul tank. The new storage tank must be fitted to work and not compromise the integrity of the fire suppression system such as the inlet values, pressure switches and controls, outlet valves, & voltages. Dale Hollow Power Plant staff will remove the existing 3.75-Ton Ansul Low Pressure Carbon Dioxide Refrigerated Storage Unit, disconnect piping, and prepare the area for the new footprint of the tank. (Optional) Cordell Hull Power Plant staff will remove the existing 6-Ton Ansul Low Pressure Carbon Dioxide Refrigerated Storage Unit, disconnect piping, and prepare the area for the new footprint of the tank. (Optional) Wolf Creek Power Plant staff will remove the existing 4-Ton Ansul Low Pressure Carbon Dioxide Refrigerated Storage Unit, disconnect piping, and prepare the area for the new footprint of the tank. (Optional) Laurel Power Plant staff will remove the existing 4-Ton Ansul Low Pressure Carbon Dioxide Refrigerated Storage Unit, disconnect piping, and prepare the area for the new footprint of the tank. For the purposes described herein, the USACE Nashville District intends to issue a sole source solicitation that will include the brand name items listed below: Manufacturer: Janus Fire Systems Quantity: 2 Items: 4-Ton and 6-Ton Janus Low Pressure Carbon Dioxide Storage Tanks The ANSI, ASME, OSHA, and EM385 standards listed below must be met for technical acceptance. A Voltage Requirement A1. 460V, 3 phase, 60HZ B Pressure requirements and Valves B1. Pressure switch (inside) B2. Pressure and liquid level gauges B3. Bleeder valve(s) B5. Safety Relief valve B7. Ball valve (manual limit switch, ½”) B8. Pressure regulator C Other C1. 6” x 4” reducer flange C2. Commercial grade scroll compressor with R454A This Notice of Intent is not a request for competitive quotes. All responsible sou…
Classification
Place of Performance
Contracting Office
Contacts