AI Summary
AI summary · generated 11/24/2026 · verify on SAM.gov
Description
1.0 PURPOSE & OBJECTIVE PAE Maritime, on behalf of the dPAE Combatants/ DDG 1000 Class Program Office (PMS 500), is conducting market research to assess industry capabilities, engineering rigor, and shipyard infrastructure necessary to accomplish the industrial integration and installation of the Large Missile Vertical Launch System (LMVLS) aboard the USS Michael Monsoor (DDG 1001). The primary objective of this RFI is to evaluate prospective offerors' specific technical expertise, dry dock/pier-side heavy-lift capabilities, dimensional control methodologies, and integrated production scheduling to execute the installation of a pre-manufactured ~600-ton LMVLS module and associated Conventional Prompt Strike (CPS) warfare alterations. The questions contained in Section 3.0 are specifically structured to allow industry respondents to demonstrate their understanding of the unique structural, spatial, lifting, and combat systems complexities associated with this depot modernization period. 2.0 TECHNICAL BASELINE & REQUIREMENT SUMMARY Key technical parameters within the DDG 1001 CPS DMP include: 2.1 Ship Particulars Vessel: USS Michael Monsoor (DDG 1001) Length Overall (LOA) / LBP: 186 m (610 ft) / 182.9 m (600 ft) Beam (Maximum): 24.6 m (80.7 ft) Draft (Navigational / DWL): 8.4 m (27.6 ft) / 7.0 m (23.0 ft) Hull Form & Superstructure: Wave-piercing tumblehome hull; steel hull structure with composite deckhouse; integrated power system (IPS). 2.2 LMVLS Pre-Manufactured Assembly Profile (GFM) The Government plans to deliver the LMVLS as Government-Furnished Material (GFM) as a fully out-fitted, pre-manufactured modular block. The industrial effort will require rigging, lifting, transferring, lowering, and setting the ~600-ton LMVLS module into the hull pocket within tight spatial and angular tolerances. Additional specifications include: Envelope Dimensions: Approximately 44' 7” Length × 20' 8” Width × 41' 1” Height. Total Lift Weight: Approximately 600 Long Tons (LT) . Component Integration: Four (4) launch tubes housing Advanced Payload Modules (APMs) and All-Up Round Canisters (AUR-C), integral shock-isolation foundation assemblies, multi-level bulkheads (down through L5), decks, pre-installed outfitting, and weather deck / 01-level hatch structures. Installation Location: Forward Stack 1400 (reclaimed forward space following MT 61 AGS complete removal). 3.0 TECHNICAL CAPABILITY QUESTIONNAIRE Interested sources are requested to provide detailed technical narrative responses, supported by engineering calculations, facility specifications, past performance references, and risk mitigation methodologies, addressing each section below. Section A: Heavy Lift, Rigging & Facility Engineering Capabilities Lifting Infrastructure & Capacities: Detail your primary crane assets (gantry, floating, portal, or crawler) capable of hoisting and swinging a 600-ton (approx. 1,344,000 lbs) rigid modular assembly. Provide the specific crane load charts demo…
Classification
Contracting Office
Contacts